CAP Checklist Date: July 14, 2004 CAP#923 _ |x| Has the interaction with the load been checked? Yes. The ACIS radzone entry commanding ends at 2004:197:19:05:08, roughly 5 min after the start of comm, and nearly 2 hours before the end of comm, so there will be no ACIS command contentions. _ |x| Has comm been identified and duration estimated accurately? Yes. 2004:197:19:00 - 2004:197:21:00 The execution of the CAP should easily fit within the scheduled 2 hour comm. _ |x| If SCS slots are used, is there SCS slot contention? No. SCS slots 201, 202, 196 and 189 are used and there is no contention. SOP_61070_WARMBOOT does not use SCS slots SOP_61010_DEA_HKP uses slots 137 and 185 and there is no contention. _ |x| Does the CAP perform SCS slot cleanup? Both the CAP and SOP_61010 perform SCS slot cleanup. _ |x| Does the CAP set the correct format at completion? N/A use FMT 2 throughout. _ |x| What happens if comm is lost during the CAP execution? It depends on which point in the CAP. It could mean loss of desired memory dumps. In the worst case, the ACIS BEP could be left ``unbooted.'' _ |x| Does CAP require radmon to be enabled or disabled to be compatible with current load? No. _ |x| What is the worst case scenario for the CAP execution? BEP fails to warmboot or loss of comm while BEP is rebooting. - what science can be lost? The BEP would be off, no science runs could be executed until the BEP is completely rebooted. - does action generate significant momentum? No - can safe mode be triggered during the CAP? No _ |x| List (or attach list) of products that are required (loads, scripts, CAPs). Include version number for scripts and CAPs. Command Loads 1. 1A_RBDCA_201.CLD 2. 1A_RBICA_202.CLD 3. 1A_RB000_196.CLD 4. 1A_RB002_189.CLD ---- for SOP_61010_DEA_HKP 5. 1A_WD000_137.CLD 6. 1A_XD000_185.CLD Scripts 7. O_SCSCRTL 8. C_SET_FORMAT SOPs 9. SOP 61010 10. SOP 61070 _ |x| Are all products certified and do CAP and scripts have version 3.0 or higher? Yes. _ |x| Has OC verified that all required products are available on console? Yes _ |x| Does the CAP require an OBSID change? No - |x| If a Flight Software Patch, has the checkbook checksum been compared with the value in the CAP? N/A _ |x| Who will be on-console and is the CAP being run at a reasonable time? OC/CC and ACIS ops. Yes, CAP is being run at a reasonable time. 07/15/04: 3:00-5:00 PM EDT _ |x| Has CAP been reviewed by FD, FOT, SOT lead and OC or their designee? Comments: None To be attached to the signed CAP. Rev 1.6, 13 Dec 2001, RJB