To:sot_shift from: Dan Schwartz date: 02 May 02, 12:00noon EDT Subject: SOT shift report 2002-05-02 L1015 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/May_02_2002_L1015.txt. Shift L1015. Start at 122:12:00 GMT = 08:00am 02 May EDT End 12:00 noon 02 May SOT Lead DAS (Times will be given in GMT on day 122.) PLAN ---- Continue running load APR2902C. Do ACIS-S observations of the luminous z>4 quasar PSS1347+4956, obsid 3159, and the soft X-ray weak quasar HS 1237+4756, obsid 3073. Then do ACIS-I obsid 3347, a continuation of the Lockman hole survey. This survey data will be public immediately, (following V&V). No Comm this shift. Next Comms: 122:1700 to 1800 123:0200 to 0300 123:0955 to 1155 123:1820 to 2020 124:0500 to 0600 124:1340 to 1440 124:2300 to 0000 125:0800 to 0900 125:1700 to 1800 Orbital events: 2002:122:20:13:27.213 EAPOGEE 378 ORBIT APOGEE 2002:124:03:57:53.023 EPERIGEE 378 ORBIT PERIGEE 2002:125:11:41:24.577 EAPOGEE 379 ORBIT APOGEE 2002:126:19:25:06.072 EPERIGEE 379 ORBIT PERIGEE 2002:129:10:52:34.387 EPERIGEE 380 ORBIT PERIGEE 2002:130:18:37:11.103 EAPOGEE 381 ORBIT APOGEE 2002:132:02:20:58.463 EPERIGEE 381 ORBIT PERIGEE EVENTS ------ Status at LOS, 122:08:58, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 194.960 deg Dec = 27.996 deg ROLL = 211.593 deg Format = 1 OBSID = 3292 COMA Cluster SIM FA = -715 SIM TSC = -50504 (HRC-I) HETG = OUT (79.46 deg) LETG = OUT (77.96 deg) HRC-I HV is ON EPHIN Geom = LARG E1300 = 0.0 LT 10.0 (RADMON P4GM = 0.5 LT 300. Triggers) P41GM = 0.0 LT 8.47 A-leak = 1.0200 mu-a B-leak = 0.4440 mu-a Ascending through 123553 km. ACIS focal plane temperature -119.7. NOTES/ISSUES/PROBLEMS From the 9am status meeting: Three 34m supports, no problems, last segments of APR2902C were uplinked and on-board loads are good through 126:00:27. Current on SSR dumps. MAY0602B was approved and signed off yesterday. Migration to OFLS 9.2b is now taking place, with regression testing planned for later today. It is planned to use 9.2b starting tomorrow for the MAY1302 load. GRETA patch 1.2.2 was signed off yesterday. This fixes some plotting resolution and color issues for the OCC machines. Off-site machines need not install for functionality, but should to keep synched to the OCC GRETA version. (Otherwise, the 1.3 release will re-synch the software.) Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- 3138 3C321 120:13:39 ACIS-S NONE Looks good ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 877-693-7198 PIN 693-7198 or e-mail 6937198@archwireless.net -------------------------------------------------------