To:sot_shift from: Dan Schwartz date: 02 Mar 07, 12:00noon EST Subject: SOT shift report 2007-03-02 L2780 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/web-cxc/htdocs/acis/SOT_reports/Mar_02_2007_L2780.txt. Shift L2780. Start at 061:13:00 GMT = 08:00am 02 Mar EST End 10:00am 02 Mar SOT Lead DAS (Times will be given in GMT on day 061.) PLAN ---- Continue running load FEB2607C. CTI measurements surrounding perigee passage. Then obsid 8029, an ACIS-I observation of IGR J1335+0710, and 8219, an ACIS-S observation of Jupiter. Next Comms: Support (GMT) BOT EOT Station Site Track time (local) 061/1905-2055 1945 2045 DSS-46 CANBERRA 1445-1545 EST, Fri 2 Mar 062/0225-0440 0325 0425 DSS-27 GOLDSTONE 2225-2325 EST, Fri 2 Mar 062/1205-1420 1305 1405 DSS-27 GOLDSTONE 0805-0905 EST, Sat 3 Mar 062/2010-2300 2050 2250 DSS-66 MADRID 1550-1750 EST, Sat 3 Mar 063/0245-0500 0345 0445 DSS-24 GOLDSTONE 2245-2345 EST, Sat 3 Mar 063/1050-1305 1150 1250 DSS-27 GOLDSTONE 0650-0750 EST, Sun 4 Mar 063/1830-2120 1910 2110 DSS-46 CANBERRA 1410-1610 EST, Sun 4 Mar 064/0230-0420 0310 0410 DSS-66 MADRID 2210-2310 EST, Sun 4 Mar 064/1435-1650 1535 1635 DSS-54 MADRID 1035-1135 EST, Mon 5 Mar Orbital events: 2007:060:13:51:46.338 1045 EAPOGEE ORBIT APOGEE 2007:061:21:34:40.949 1045 EPERIGEE ORBIT PERIGEE 2007:063:05:19:09.847 1046 EAPOGEE ORBIT APOGEE 2007:064:13:02:40.251 1046 EPERIGEE ORBIT PERIGEE 2007:065:20:46:36.271 1047 EAPOGEE ORBIT APOGEE EVENTS ------ Status at LOS, 061:13:44, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 8 FIDS = 0 RA = 150.999 deg Dec = -18.997 deg ROLL = 334.859 deg Format = 2 OBSID = 58512 descending cti SIM FA = -467 SIM TSC = -99616 (HRC-S) DITHER = ENAB HETG = IN ( 5.96 deg) LETG = OUT (77.59 deg) HRC-I HV is ON EPHIN Geom = SMALLARG E150 = 29170.7 E300 = 57.1 E1300 = 7.1 LT 20.0 (RADMON P4GM = 0.0 LT 300. DISABLED) P41GM = 0.0 LT 8.47 A-leak = 1.0200 mu-a B-leak = 0.0000 mu-a Descending through 71218 km. ACIS focal plane temperature -118.6 degC. EPH temp: 101.13 degF EPH 27V: 13.18 NOTES/ISSUES/PROBLEMS From the 9am status meeting: Three supports over the past day, no issues. One stored command segment uplinked, on-board loads good until 064:05:58 MAR1207 products likely out Tuesday. There is an issue with EPHIN temperatures. Engineering quarterly report released yesterday. This is the semi-annual summary report. See http://occweb.cfa.harvard.edu/occweb/web/fot_web/eng/reports/quarterlies/2007_Q1.htm Exchange server organization proceeded smoothly yesterday. There is one email issue. Also, OCC web is inordinately slow this morning. New telemetry database is installed on string 3. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- No new quick look images. (Joy is out sick. We hope she feels better soon!) ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 cell phone: (617)512-5627 pager: email to 6175125627@vtext.com -------------------------------------------------------