To:sot_shift from: Dan Schwartz date: 02 Nov 07, 12:00noon EDT Subject: SOT shift report 2007-11-02 L3025 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/web-cxc/htdocs/acis/SOT_reports/Nov_02_2007_L3025.txt. Shift L3025. Start at 306:12:00 GMT = 08:00am 02 Nov EDT End 10:00am 02 Nov SOT Lead DAS (Times will be given in GMT on day 306.) PLAN ---- Continue running load OCT3107B. Do obsid 8594, an ACIS-I observation of the Chandra Deep Field South as part of the DDT observation to extend the survey depth to 2 Msec. Next Comms: 306/1700-1950 1740 1940 DSS-66 MADRID 1340-1540 EDT, Fri 2 Nov 307/0215-0430 0315 0415 DSS-27 GOLDSTONE 2315-0015 EDT, Fri 2 Nov 307/1440-1730 1520 1620 DSS-66 MADRID 1120-1220 EDT, Sat 3 Nov 307/1900-2050 1940 2040 DSS-46 CANBERRA 1540-1640 EDT, Sat 3 Nov 308/0225-0415 0305 0405 DSS-66 MADRID 2305-0005 EDT, Sat 3 Nov 308/1000-1215 1100 1200 DSS-27 GOLDSTONE 0600-0700 EST, Sun 4 Nov 308/2105-2320 2205 2305 DSS-27 GOLDSTONE 1705-1805 EST, Sun 4 Nov 309/0210-0425 0310 0410 DSS-27 GOLDSTONE 2210-2310 EST, Sun 4 Nov 309/1000-1215 1100 1200 DSS-27 GOLDSTONE 0600-0700 EST, Mon 5 Nov Orbital events: 2007:306:11:58:09.178 1138 EAPOGEE ORBIT APOGEE 2007:307:19:41:34.437 1138 EPERIGEE ORBIT PERIGEE 2007:309:03:25:23.708 1139 EAPOGEE ORBIT APOGEE 2007:310:11:09:10.075 1139 EPERIGEE ORBIT PERIGEE 2007:311:18:52:30.730 1140 EAPOGEE ORBIT APOGEE 2007:313:02:36:19.143 1140 EPERIGEE ORBIT PERIGEE EVENTS ------ Status at LOS, 306:11:44, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 53.105 deg Dec = -27.830 deg ROLL = 23.994 deg Format = 2 OBSID = 8594 chandra deep field south SIM FA = -535 SIM TSC = 92903 (ACIS-I) DITHER = ENAB HETG = OUT (79.09 deg) LETG = OUT (77.59 deg) HRC-I HV is ON EPHIN Geom = SMAL E150 = 61.0 E300 = 5.3 E1300 = 7.6 LT 20.0 (RADMON P4GM = 0.0 LT 300. Triggers) P41GM = 0.0 LT 8.47 Ascending through 132760 km. ACIS focal plane temperature -119.7 degC. EPH temp: 109.34 degF EPH 27V: 10.74 NOTES/ISSUES/PROBLEMS Daylight savings time ends 2am Sunday Nov 4. GMT will then be 5 hours ahead of EST. From the 9am status meeting: Four supports over the past day. No issues. NOV1207 products are in work, expected to be released on Monday. FDB yesterday approved turning off the EPHIN G detector, and conducting a test turning off the ACIS detector housing heater for an entire perigee passage at a pitch angle ~140 deg. NAS 2 remains failed. Yesterday NAS 1 stopped exporting data base resources, but situation was fixed in time to support the pass. We remain exposed to single failure of NAS 1, but plan to implement a workstation backup next week. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- No new quick looks. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 cell phone: (617)512-5627 pager: email to 6175125627@vtext.com -------------------------------------------------------