SOT Shift Report 2008-08-15 L3312 Duration: 15 Aug 2008 08:30 EDT - 15 Aug 2008 09:30 EDT 15 Aug 2008 12:30 GMT - 15 Aug 2008 13:30 GMT SOT Lead: Tom Aldcroft ======================================== Plan ---- Resume science mission with the AUG1608A loads starting at 2008:228:13:52:27: T_X47 CAL-ER (57650) 2008:228:14:04:02.829 10.0 -- -- 09088 0 PSR B1957+20 2008:228:17:19:17.034 169.0 ACIS-S NONE T_E47 CAL-ER (57649) 2008:230:17:03:56.551 7.9 -- -- Events ------ No comm this shift. Notes from 9am meeting ---------------------- Ops: - Supports Completed: 2 (2 34 Meter, 0 26 Meter) - SCS's Loaded: 2 - Good through: 2008:230:19:14:01.000 - CAP's / Procedures Run: CAP # Time Title / Description / Notes 1071 227/1929z PR-227 Uplink to Update ET Offset 1068 227/2015z Normal Sun Mode Recovery 1073 228/0004z Reapply EIO Patches 977 228/0035z Check Radmon Process 675A 228/0330z Re-enable SCS 107 1075 228/0337z Enable SCS 26 - SSR Dumps: 4 - Current Configuration (as of 228/1300): In Radiation Zone NO Current SI None, Finished ACIS-I Grating NONE Observation ID Target Altitude 36.4 kkm Asc Radmon Disable 230/16:26z Next Radiation Zone Event not available yet. - Next Scheduled Supports (7): Time BOT EOT Site Station Antenna 228/1635-0055 1720 0040 GOLDST DSS-27 34 Meter 229/0245-0500 0345 0445 GOLDST DSS-27 34 Meter 229/1020-1235 1120 1220 GOLDST DSS-27 34 Meter 229/1805-2100 1845 2050 MADRID DSS-66 26 Meter 230/0115-0330 0215 0315 GOLDST DSS-24 34 Meter 230/1050-1340 1130 1230 MADRID DSS-66 26 Meter 230/1920-2210 2000 2100 MADRID DSS-66 26 Meter MP: - AUG1608A loads approved and uplinked. - AUG1808C products are expected out very shortly. Hoping for a relatively short turnaround for review. Eng: - The NSM recovery is complete and the spacecraft is now close to the nominal configuration. The Offline OBC VCDU is still off by one major frame but this has no impact on normal operations. Most of the thermal limit checks are now in-state but a few are still coming down after the extended stay at 90 sun pitch. - Will now start the detailed investigation of the initial CTU telemetry processor reset. Radiation: - Solar Activity Forecast: Solar activity is expected to be very low for the next three days (15-17 August). - Geophysical Activity Forecast: The geomagnetic field is expected to be quiet for the next two days (15-16 August). A small increase to quiet to unsettled is expected for the third day (17 August) in response to a recurrent solar sector boundary crossing. Snapshot -------- (Reflects the state after NSM recovery prior to mission loads starting) UTC 2008:228:13:12:07 (Aug15) f_ACE 1.74e+01 F_CRM 0.00e+00 Kp 1.3 R km 45036A OBT 2008:228:13:08:45 CTUVCDU 1063551 OBC s/w NRML FMT2_NORM CPEstat NORM OBT 335192925.11 ONLVCDU 1063536 OBC Errs 0 OBSID 57652 EPState SUN SIM TTpos -99615 HETG Angle 79.09 PCADMODE NPNT RA 337.000 Bus V 29.93 SIM FApos -535 LETG Angle 77.21 PCONTROL NPNT Dec 15.000 Bus I 23.14 AOFSTAR GUID Roll 156.710 ACA Object SSSSSSSS Dither DISA HRC-I HV OFF ACA ImFunc TTTTTTTT Dith Yang 0.00 Yaw Rate -0.00 HRC-S HV ON ACA CCD Temp -19.6 Dith Zang 0.00 Pitch Rate 0.28 SHLD HV 0.0 ACA Int Time 1.698 Roll Rate -0.14 EVT RT 0 AOACSTAT OK FSS SunBeta NSUN SHLD RT 0 FSS Alfa -17.87 Batt 1 SOC 100.00% Avg HRMA Temp 70.65 FSS Beta -49.78 Batt 2 SOC 100.00% ACIS Stat7-0 67 Avg OBA Temp 55.57 SA Resolv 148.78 Batt 3 SOC 100.00% Cold Rad -125.5 OBA Tavg Fault NFLT SA Sun Pres ILLM Warm Rad -86.9 OBA Trng Fault NFLT +Y SA Amps 11.21 RadMon DISA HRMA power 46.00 SCS 128 ACT -Y SA Amps 11.60 EPHIN Geom SMAL OBA power 78.70 SCS 129 ACT +Y SA Temp 112.66 E150 1489170.7 SCS 130 INAC -Y SA Temp 113.58 E300 14020.9 Roll Mom. 6.342 SCS 107 INAC E1300 59.1 Pitch Mom. 16.336 UpL Cmd Acc 60839 EPH A-Leak 1.0200 P4GM 1184.3 Yaw Mom. 3.842 Cmd Rej A 247 EPH B-Leak 1.0200 P41GM 0.1 EPH temp 102.38 Gyro 2 Curr 1 103.20 Roll Bias -0.9782 EPH 27I 7.19 M Unload MON Gyro 2 Curr 2 108.00 Pitch Bias -2.0357 TSC Move STOP Prop. line 03 82.65 Yaw Bias -1.1464 CTX A PWR 36.43 FA Move STOP Prop. line 04 59.50 CTX A Volts 3.52 OTG Move DISA