To:sot_shift from: Dan Schwartz date: 15 May 08, 12:00noon EDT Subject: SOT shift report 2008-05-15 L3221 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/web-cxc/htdocs/acis/SOT_reports/May_15_2008_L3221.txt. Shift L3221. Start at 136:13:00 GMT = 08:00am 15 May EDT End 10:00am 15 May SOT Lead DAS (Times will be given in GMT on day 136.) PLAN ---- Continue running load MAY1208B. Finish obsid 9135, an ACIS-S ToO observation of the gamma ray burst GRB080319B, to study the late time light curve and search for achromatic jet breaks. Then resume the series of 2ks ACIS-I observations to survey a 6 x 1 degree region at 1.5 deg above the galactic center. Next Comms: 136/1830-2045 1930 2030 DSS-27 GOLDSTONE 1530-1630 EDT, Thu 15 May 137/0245-0500 0345 0445 DSS-27 GOLDSTONE 2345-0045 EDT, Thu 15 May 137/1000-1215 1100 1200 DSS-27 GOLDSTONE 0700-0800 EDT, Fri 16 May 137/1840-2130 1920 2120 DSS-66 MADRID 1520-1720 EDT, Fri 16 May 138/0245-0500 0345 0445 DSS-27 GOLDSTONE 2345-0045 EDT, Fri 16 May 138/1230-1520 1310 1510 DSS-66 MADRID 0910-1110 EDT, Sat 17 May 138/1850-2140 1930 2130 DSS-66 MADRID 1530-1730 EDT, Sat 17 May Orbital events: 2008:135:20:27:48.424 1211 EPERIGEE ORBIT PERIGEE 2008:137:04:11:09.487 1212 EAPOGEE ORBIT APOGEE 2008:138:11:54:45.647 1212 EPERIGEE ORBIT PERIGEE 2008:139:19:38:18.221 1213 EAPOGEE ORBIT APOGEE 2008:141:03:21:43.312 1213 EPERIGEE ORBIT PERIGEE 2008:142:11:05:55.391 1214 EAPOGEE ORBIT APOGEE EVENTS ------ Status at LOS, 136:12:37, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 217.941 deg Dec = 36.321 deg ROLL = 196.258 deg Format = 2 OBSID = 9135 Gamma Burst GRB080319B SIM FA = -467 SIM TSC = 75623 (ACIS-S) DITHER = ENAB HETG = OUT (79.09 deg) LETG = OUT (77.21 deg) HRC-I HV is ON EPHIN Geom = SMAL E150 = 54.9 E300 = 5.9 E1300 = 7.1 LT 20.0 (RADMON P4GM = 0.1 LT 300. Triggers) P41GM = 0.0 LT 8.47 Ascending through 111312 km. ACIS focal plane temperature -119.7 degC. EPH temp: 107.86 degF EPH 27V: 26.84 NOTES/ISSUES/PROBLEMS From the 9am status meeting: Three supports over the past day. No issues. First two segments of the MAY1608B loads were uplinked. On-board loads good until 140:12:30. Pre-approved CAP to uplink the monthly ephemeris update was successful yesterday. May 1608B loads were approved yesterday. A new backstop version will be deployed today. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- no new quick looks. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 cell phone: (617)512-5627 pager: email to 6175125627@vtext.com -------------------------------------------------------