ACIS ECS CTI measurement, July 19, 2012 --------------------------------------- Shift: H4747 CAP 1250 Plan ---- Run CAP 1249 as soon as convenient during the 2012:201:22:40 pass. CAP will: - Check radiation levels and safe SIM position - Set correct telemetry format - Enable SCS107 and RADMON - Set Obsid to 62676 - Uplink, enable and activate the 34 hour CTI SCS load, 1A_CTI5_24HR_135.CLD - ACIS confirms normal start of science run Execution: ----------- on telecon link: Nancy Adams-Wolk The HRC GOES proxy rates never cleared the threshold to execute CAP 1250. At 23:12, ACIS Ops made the decision to not execute the CAP since the Proxy rates were still fluctuating above the limit of 25600. Lowest rate seen during comm was 29541. CAP 1250 not executed.