| PI First |
First Name |
|
|
|
X |
| Last Name |
Last Name |
|
|
|
X |
| Proposal |
Proposal Id number |
|
|
|
X |
| ObsId |
Observation Id number (assigned by CXCDS) |
X |
X |
X |
X |
| SeqNum |
Observation sequence number (assigned by CDO) |
X |
X |
|
X |
| Object |
Object name |
X |
X |
X |
X |
| RA |
Right Ascension. This represents the pointing position
corrected for detector offset, but not for the SIM Z offset. |
X |
X |
|
|
| Dec |
Declination. This represents the pointing position
corrected for detector offset, but not for the SIM Z offset. |
X |
X |
|
|
| Roll |
Roll angle |
X |
|
|
|
| SIM-Z |
SIM-Z Position. SIM offset along the Z-axis (transverse direction) in mm
|
X |
|
|
|
| Instrument |
Readout instrument/detector When specifying the instrument in the selection criteria, the focal plane detector is used. This will result in an inconsistency when the readout detector is not in the focal plane. |
X |
X |
|
|
| Grating |
Transmission grating inserted |
X |
X |
|
|
| DataMode |
Data mode:
| ACIS | HRC |
| RAW |
OBSERVING |
| FAINT |
NEXT_IN_LINE |
| FAINT_BIAS |
|
| VFAINT |
|
| GRADED |
|
| CC33_FAINT |
|
| CC33_GRADED |
|
| X |
|
|
|
| ReadMode |
Read-out mode (ACIS only):
TIMED
CONTINUOUS |
X |
|
|
|
| Type |
Type of observation:
| GO | Guest Observer |
| GTO | Guaranteed Time Observation |
| TOO | Target Of Opportunity (approved by peer review) |
| DDT | Director's Discretionary Time |
| CAL | Calibration observation |
| ER | Engineering Request |
|
X |
X |
X |
X |
| Data Rights |
Data rights:
| S: Standard proprietary (12) |
| D: Discretionary (3) |
| N: None (public) |
| 1 month |
| 2 months |
| 3 months |
| 4 months |
| 6 months |
| 9 months |
|
X |
|
|
|
| Obs Date |
Start date and time of observation |
X |
X |
X |
X |
| OCat Status |
Status of the observation in the archive:
| unobserved |
| scheduled |
| partially observed |
| observed |
| archived |
| discarded |
| canceled |
Note that this status changes
from scheduled to (partially) observed only when the data products are
ingested into the archive) |
X |
|
|
|
| Public Rel Date |
Date when data products become (became) publicly available; NULL means
unknown |
X |
X |
|
X |
| Apprvd Time |
Approved exposure time (ks) |
X |
|
X |
X |
| Sched Time |
Scheduled time (ks) |
|
|
X |
|
| On Target Time |
Total time spent on-target (ks) |
|
|
X |
|
| Good Time |
Good data exposure time (ks) |
X |
|
X |
X |
| Charge Time |
Time charged against allocation (ks) |
X |
|
|
|
| Pipe. Config. |
Pipeline configuration used for processing:
| primary: | normal configuration for observations |
| secondary: | limited configuration for observation using
secondary instrument (i.e., instrument not in focal plane) |
| primary_obc: | limited configuration using on board aspect |
| standard: | limited calibration configuration (processing only through L0) |
|
X |
|
|
|
| AP/CP |
Automated processing or custom processing |
X |
X |
X |
|
| Proc Version |
Version of processing of observation |
X |
|
X |
|
| Proc Status |
Processing status (2 parts):
| DONE | completed |
| BLOCKED | pipelines need more information or a s/w fix |
| ERROR | processing error, under investigation |
| PENDING | in progress |
The second part displays the current level if not L2.
|
X |
X |
X |
|
| Proc Date |
Date of processing operation |
X |
|
X |
|
| Release |
Version of CXCDS software release used for processing |
X |
|
|
|
| CALDB Version |
Version of CALDB reference in the L2 event fits file. |
X |
|
|
|
| Issue(s) |
Issues that apply to processing of observation.
Issues shown in parentheses () are closed.
|
X |
X |
X |
X |
| Ingested |
Ingested status of data products. |
X |
|
|
|
| V&V Version |
Version of Verification & Validation of processing |
X |
|
X |
|
| V&V Status |
Verification & Validation status of Automated Processing data products:
| NULL | No V&V Report available yet |
| OK | Approved for distribution |
| Hold | Internal DS hold |
| Problem | Referred to CDO |
| Repro+DD | Reprocessing required but distribution approved |
| ReprNoDD | Reprocessing required; do not distribute |
|
X |
X |
X |
|
| Review |
Review by Chandra Director's Office or Aspect team required |
X |
X |
X |
|
| V&V Date |
Date of Verification & Validation |
X |
X |
X |
|
| Data Distr Date |
Data delivery date: Date PI was notified of data being available |
X |
X |
X |
X |
| Data Mail Date |
Date hard medium was mailed |
X |
|
X |
|