To:sot_shift from: Dan Schwartz date: 26 Feb 09, 12:00noon EST Subject: SOT shift report 2009-02-26 L3507 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/web-cxc/htdocs/acis/SOT_reports/Feb_26_2009_L3507.txt. Shift L3507. Start at 057:13:00 GMT = 08:00am 26 Feb EST End 10:00am 26 Feb SOT Lead DAS (Times will be given in GMT on day 057.) PLAN ---- Continue running load FEB2309C. Finish obsid 9545, an ACIS-S observation of NGC 4826 as part of a sample of nearby galaxies observed by Spitzer, to study X-ray binary correlation with star formation rate. Then do ACIS cti calibrations surrounding perigee passage. Next Comms: 057/1900-2050 1940 2040 DSS-46 CANBERRA 1440-1540 EST, Thu 26 Feb 058/0245-0500 0345 0445 DSS-27 GOLDSTONE 2245-2345 EST, Thu 26 Feb 058/1120-1335 1220 1320 DSS-27 GOLDSTONE 0720-0820 EST, Fri 27 Feb 058/2020-2235 2120 2220 DSS-65 MADRID 1620-1720 EST, Fri 27 Feb 059/0245-0500 0345 0445 DSS-54 MADRID 2245-2345 EST, Fri 27 Feb 059/1000-1215 1100 1200 DSS-27 GOLDSTONE 0600-0700 EST, Sat 28 Feb 059/2005-2220 2105 2205 DSS-65 MADRID 1605-1705 EST, Sat 28 Feb 060/0245-0500 0345 0445 DSS-54 MADRID 2245-2345 EST, Sat 28 Feb Orbital events: 2009:056:18:24:09.166 1320 EAPOGEE ORBIT APOGEE 2009:058:02:08:36.303 1320 EPERIGEE ORBIT PERIGEE 2009:059:09:52:21.971 1321 EAPOGEE ORBIT APOGEE 2009:060:17:36:38.274 1321 EPERIGEE ORBIT PERIGEE 2009:062:01:19:59.871 1322 EAPOGEE ORBIT APOGEE 2009:063:09:03:31.909 1322 EPERIGEE ORBIT PERIGEE EVENTS ------ Status at LOS, 126:10:28, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 194.198 deg Dec = 21.673 deg ROLL = 109.994 deg Format = 2 OBSID = 9545 NGC 4826 SIM FA = -467 SIM TSC = 75623 (ACIS-S) DITHER = ENAB HETG = OUT (79.09 deg) LETG = OUT (77.21 deg) HRC-I HV is ON EPHIN Geom = VLD E150 = 43.0 800000 (RADMON E1300 = 99.0 1000 Triggers) Descending through 106583 km. ACIS focal plane temperature -119.5 degC. EPH temp: 110.83 degF NOTES/ISSUES/PROBLEMS From the 9am status meeting: Three supports over the past day. No issues. MAR0209C products released for email review by 1pm today. Review is required by all parties. ASVT equipment will be turned on and checked out this morning. Workstations appear to be functional. HRC equipment took most severe water hit. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- 10463 ZwCl 2089 055:22:49 ACIS-S NONE ok 10367 0508-220 056:10:44 ACIS-S NONE ok 10871 EXO 0748-676 056:12:46 ACIS-S NONE ok 10681 G29.96-0.02 056:16:20 ACIS-I NONE ok 10297 J1222+3602 057:00:39 ACIS-S NONE ok ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 cell phone: (617)512-5627 pager: email to 6175125627@vtext.com -------------------------------------------------------