To:sot_shift from: Dan Schwartz date: 20 Jan 09, 12:00noon EST Subject: SOT shift report 2009-01-20 L3470 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/web-cxc/htdocs/acis/SOT_reports/Jan_20_2009_L3470.txt. Shift L3470. Start at 020:13:00 GMT = 08:00am 20 Jan EST End 10:00am 20 Jan SOT Lead DAS (Times will be given in GMT on day 020.) PLAN ---- Continue running load JAN1909C. Finish obsid 10368, an ACIS-S observation of the jet in the quasar 0707+476, as part of a survey for X-ray jets. Then do obsid 10859, an ACIS-S/HETG observation of SS73 17, a Mira-type symbiotic system with hard X-ray emission, to reveal the origin of the Fe lines. Then into perigee passage. Next Comms: 019/1810-2025 1910 2010 DSS-27 GOLDSTONE 1410-1510 EST, Mon 19 Jan 020/0045-0300 0145 0245 DSS-54 MADRID 2045-2145 EST, Mon 19 Jan 020/1025-1240 1125 1225 DSS-27 GOLDSTONE 0625-0725 EST, Tue 20 Jan 020/1930-2140 2010 2130 DSS-46 CANBERRA 1510-1630 EST, Tue 20 Jan 021/0130-0345 0230 0330 DSS-27 GOLDSTONE 2130-2230 EST, Tue 20 Jan 021/1000-1215 1100 1200 DSS-27 GOLDSTONE 0600-0700 EST, Wed 21 Jan 021/1910-2125 2010 2110 DSS-54 MADRID 1510-1610 EST, Wed 21 Jan Orbital events: 2009:019:17:47:38.469 1306 EAPOGEE ORBIT APOGEE 2009:021:01:30:54.707 1306 EPERIGEE ORBIT PERIGEE 2009:022:09:16:05.141 1307 EAPOGEE ORBIT APOGEE 2009:023:16:59:27.764 1307 EPERIGEE ORBIT PERIGEE 2009:025:00:44:59.086 1308 EAPOGEE ORBIT APOGEE 2009:026:08:28:46.787 1308 EPERIGEE ORBIT PERIGEE 2009:027:16:14:10.838 1309 EAPOGEE ORBIT APOGEE 2009:028:23:58:21.081 1309 EPERIGEE ORBIT PERIGEE EVENTS ------ Status at LOS, 020:12:23, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 107.7082 deg Dec = 47.558- deg ROLL = 208.918 deg Format = 2 OBSID = 10368 0707+476 SIM FA = -467 SIM TSC = 75623 (ACIS-S) DITHER = ENAB HETG = OUT (79.09 deg) LETG = OUT (77.21 deg) HRC-S HV is ON EPHIN Geom = VLD E150 = 92.0 E300 = 81.0 E1300 = 97.0 Descending through 103298 km. ACIS focal plane temperature -119.7 degC. EPH temp: 104.89 degF NOTES/ISSUES/PROBLEMS From the 9am status meeting: Three supports, no issues. One stored command sequence uplinked, on-board loads good until 023:20:00. JAN2609 will include a ToO approved yesterday. Products hopefully out tomorrow morning. The thermal working group will meet today, 11am on 111159#. REMINDER: Backup OCC demo will be tomorrow. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- 10855 SNR 1987A 018:17:29 ACIS-S HETG OK 10760 4U 0614+091 018:23:25 ACIS-S HETG OK 10490 GRB090113 019:12:54 ACIS-S NONE OK ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 cell phone: (617)512-5627 pager: email to 6175125627@vtext.com -------------------------------------------------------