SOT Shift Report 2009-07-28 L3659 Duration: 28 Jul 2009 08:30 EDT - 28 Jul 2009 09:30 EDT 28 Jul 2009 12:30 GMT - 28 Jul 2009 13:30 GMT SOT Lead: Tom Aldcroft ======================================== Plan ---- Continue with the JUL2709A loads: 10767 J1718-3718 2009:209:04:32:22.123 37.5 ACIS-S NONE 10060 NGC 6440 2009:209:15:18:08.796 50.2 ACIS-S NONE 10129 PSR J1852+0040 2009:210:05:40:22.378 32.0 ACIS-S NONE 10382 3C 268.3 2009:210:15:10:14.931 42.9 ACIS-S NONE Events ------ 0925 BOT DSS-27 GOLDSTONE 1305 EOT Notes from 9am meeting ---------------------- Ops: - Supports Completed: 4 (3 34 Meter, 1 26 Meter) - SCS's Loaded: 1 - Good through: 2009:212:19:39:03.000 - CAP's / Procedures Run: 1121 208/2131z Switch to FMT 4 to collect High Rate MUPS Pressure data - SSR Dumps (5) - Current Configuration (as of 209/1300): In Radiation Zone NO Current SI ACIS-S Grating NONE Observation ID 10767 Target J1718-3718 Altitude 115.3 kkm Asc Radmon Disable 211/03:11z Next Radiation Zone 211/03:11z to 211/17:25z - Next Scheduled Supports (3): Time BOT EOT Site Station Antenna 209/1805-2020 1905 2005 GOLDST DSS-27 34 Meter 209/2340-0500 0040 0445 GOLDST DSS-27 34 Meter 210/0650-1114 0750 1059 GOLDST DSS-27 34 Meter MP: - AUG0309A loads approved. Eng: - OTG testing complete, now writing up documentation and test results - MUPS pressure stable over the last 24 hours - Ran CAP 1121 to gather high rate MUPS pressure data Radiation: - Solar Activity Forecast: Solar activity is expected to be very low. - Geophysical Activity Forecast: The geomagnetic field is expected to be quiet for the next three days (28-30 July). Quicklooks ---------- 10061 4U 1608-52 ACIS-S NONE OK 9962 LP 400-22 ACIS-S NONE OK 10332 SDSS J145504+.. ACIS-S NONE OK