Aug 5 1999 L14 Shift SOT Lead Bill Podgorski SpcCraft/Aspect Rob Cameron FOT/Sci liason Eric Martin HRC Adrian Roy/Gary Meehan ACIS Paul Plucinsky/Royce Buehler/Mark Bautz (Times will be given in GMT on day 217, not precise.) PLAN Complete ACIS Internal CAL per SAP61082 Continue vacuum monitor monitoring Continue ACIS-S Event Histogram - OBSID 62986 Turn vacuum monitor off before earth scan Perform ACIS 3x3 test per SAP61077 EVENTS TIME OBSID -------------- --------- ----- Start shift (6:00am EDT 05 Aug 1999) 217:10:00 62726 Handover Goldstone to Canberra 217:10:35 Continue monitoring ACA fidlites ongo Continue ACIS Internal Cal ongo 62726 Initiate SSR dump 217:11:10 Execute CAP 129 with option 3 FID lite magnitudes 217:11:20 Complete CAP 129 217:11:32 Complete SSR dump 217:11:48 Recycle PTP's to try to fix ratty telemetry 217:12:11 Terminate ACIS ACIS Internal CAL(CAP155/SAP 61082) 217:13:08 Uplink new OBSID 217:13:15 62725 Initiate ACIS 3x3 data collection part 1 per SAP61077 217:13:50 (delay due to lack of proper scripts on OPS trms) 217:16:00 Start Solar Array drive range test per SAP 6A021 and CAP 166 (various pitch maneuvers) Lose track of FID lite in slot4 due to pitch maneuver 217:16:10 Change OBSID for ACIS 3x3 part 2 217:16:25 62724 Turn VACMON OFF, last press 8.6e-6 (189 cts) 217:16:49 Complete SADA Range test per CAP 166 Execute CAP 129 with option 3 FIF lite magnitudes 217:17:29 Complete CAP 129 (note: PCAD commanding in parallel) 217:17:42 ACIS resumes thermal standby script to issue STOP SCIENCE command 217:17:57 End shift (2:00pm EDT 05 Aug) 217:18:00 NOTES/ISSUES/PROBLEMS --------------------- Thermal preparing CAP to help assess effects of OBA and HRMA (Periscope) thermal control on FID lite stability. Sequence will be as follows: Turn OBA Thermal control OFF Wait 1/2 hour Turn HRMA thermal control OFF (incl periscope) Wait 1/2 hour Turn HRMA and OBA thermal control back ON ACA will monitor FID lite stability during this procedure Expect to execute it Friday after exit fron radiation belts. Ball authorized to prepare patch for ACA PEA software to improve FID lite tracking ability (do not respond to rapid anomalous fil lite motions caused by cosmic ray hits). Would like to test patch next perigee which requires patch to be built, verified, delivered. Also need to generate command loads to uplink it (Eric Martin). New timeline planned out to SSD opening available on: http://snail.msfc.nasa.gov/AXAF/AXAF.html (click on Mission replan timeline for PDF file)