To:sot_shift from: Dan Schwartz date: 5 Aug 99, 10:00pm EDT Subject: SOT shift report, Shift M15 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Aug_05_1999_M.txt. Shift M15. Start at 217:18:00 GMT = 09:00pm 5 Aug EDT End 06:00am 5 Aug SOT Lead DAS Spac/Aspect WAP/RAC FOT/Sci liason EM HRC GM ACIS ES,BF,RB (Times will be given in GMT on day 217. In general times are rough, not precise.) PLAN Secure SI for radiation belt passage Perform SSR playback Perform earth scan #20 EVENTS 18:00 stop science issued for ACIS 3x3, OBSID 62724. 18:06 ACIS confirms radiation protection ATS has executed. Change to OBSID 62486 at 18:45, for earth sensor scan. LOS from Diego, 20:38. Pick up Diego again at 21:16. Lose 2 fid lights. Reacquire with CAP 129, option 3. 22:23 LOS from Diego. Pick up Goldstone 23:47 00:11 switch to format 4. 00:00 start earth scan 20 01:00 Execute CAP 129 with option 3 FID lite magnitudes. One light is acquired in slot 0 so CAP is run again. All 4 lights acquired in proper slots. NOTES/ISSUES/PROBLEMS After ACIS door opening, OAC Phase 1, Mission Planning will only cover the day Shift, shift B, 09:19am to 21:19. So we need to coordinate ALL schedule updates during that shift, for Phase 1. Late switch to format 4 caused some loss of earth scan 20 data. Flight note 214 was issued reporting an inferrence of spurious commands. During solar array range of motion test, around 217:18:37, software found extra commands not thought to be sent. 3 received at OBC at time only one was sent. An extra Enable SCS 8 command was received, and flagged as an error because was already enabled. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 800-759-8352 PIN 1636502 or e-mail 1636502@skytel.com -------------------------------------------------------