Aug 7 1999 L16 Shift SOT Lead Bill Podgorski SpcCraft/Aspect FOT/Sci liason HRC Ralph Kraft/Gary Meehan ACIS Yousef Butt (Times will be given in GMT on day 219, not precise.) PLAN ACIS Internal CAL per SAP61082 Continue vacuum monitor monitoring Slosh test per SAP 6A020, CAP 175, CAP 173 Planning for long term pitch test at 45 deg per CAP 180 EVENTS TIME OBSID -------------- --------- ----- Start shift (6:00am EDT 07 Aug 1999) 219:10:00 62478 Propellant Slosh Test per SOP 6A020 ongo Begin Slosh eval maneuvers per CAP 173 219:10:04 (beginning delayed by comm problems) Swapped from GOLDSTONE(DSS-27) to CANBERRA 219:10:10 Received state vector Apogee = 139,188 km Perigee = 9652 knm (target = 9676 km) Orbit Period = 63:29:20 Start ACIS Internal CAL SOP 61082 219:10:17 62718 Perform EIA sequencer test 219:10:43 Initiate SSR dump @256Kbits/sec 219:11:10 Complete SSR dump 219:12:31 OBSID change 219:13:32 62717 Telecon on slosh tests (postponed to 2:00pm EDT) 219:14:00 Slosh tests completed 219:15:45 Change OBSID 219:16:05 62716 LOS Diego Garcia 219:16:20 AOS Madrid 219:16:42 End shift (2:00pm EDT 05 Aug) 219:18:00 NOTES/ISSUES/PROBLEMS --------------------- Slosh telecon cancelled due to data not being ready. Rob Cameron and Mike Juda will review the data when available and work with Dan Schwartz to setup another telecon if needed (only if there is evidence of slosh effects).