Aug 9 1999 L18 Shift SOT Lead Bill Podgorski SpcCraft/Aspect FOT/Sci liason Eric Martin HRC John Chappell ACIS Yousef Butt (Times will be given in GMT on day 221, not precise.) PLAN Continue to cool ACIS focal plane to -90 Maneuver to 107 pitch Run ACA FID lite characterization per SAP 6A008 Run ACA Memory Dump and commanding for long term stability per SAP 6A009 Initiate ACIS Background measurements per SAP_61045_BKG_DOOR_OP SSR Dump On-orbit load to OBC-B per CAPs 188 and 189 EVENTS TIME OBSID -------------- --------- ----- Start shift (6:00am EDT 09 Aug 1999) 221:10:00 62747 Maneuver to 107 pitch done 221:10:29 Start ACA FID Lite Characterization per SAP 6A008 221:10:40 Start SSR Dump 221:11:22 Finish ACA FID Lite Characterization 221:11:33 Start ACA Memory dump & commanding for 221:11:50 Long Term Stability per SAP 6A008 Complete SSR Dump 221:11:55 Start ACIS Background Measurements per 221:12:11 62710 SAP_61045_BKG_DOOR_OP LOS Canberra (early, unexpected) 221:13:54 Ground Configure for Madrid - DSS66 221:14:27 Good telemetry from Madrid 221:14:42 Execute SAP 8O001 - On-orbit load to OBC-B 221:16:10 Execute CAP 188 - Switch VDE from A to B 221:16:15 Execute CAP 189 - uplink patches 221:16:20 Dead load OBC-B 221:16:30 Execute CAP 199 221:16:48 Go to CPE control - format 5 221:16:59 Both OBC's halted 221:17:16 Enable control on OBC-B ~221:17:30 (format 4) End shift (2:00pm EDT 09 Aug) 221:18:00 NOTES/ISSUES/PROBLEMS ---------------------