Subject: shift report M23 Mime-Version: 1.0 Date: Sat, 14 Aug 1999 00:30:55 -0400 From: "Paul P. Plucinsky" Content-Type: text/plain; charset=us-ascii X-UIDL: 68be009572aa99cce0b1d33df49a1b78 Shift report M23 August 13 1999, 11:00pm EDT, GMT 226:03:00 Spacecraft activities: perigee passage, not much happening execute CAP 258 to repeat some of the ACA nudge mode checkouts ACIS Activities - review and signoff on the RAW_STAMP procedure - get ready to run HRMA_FCM proecdure again and try to collect some interesting data while the ACA does it's thing OBSID 62694 1st stable pointing before the 1st nudge OBSID 62693 after the 1st nudge and JUST before the 2nd nudge Altitude 62,500 km FP Temp = -99.6 C 226:02:35 Start science 226:04:00 switch to FMT 1 and switch OBSID 62937, HRC tries their activation ************************************************************************* Planning meeting for daily load review We met at 7pm to review the first daily load which will begin executing at GMT 226:10:30. Ken presented a status of the DOT generation. There were only a few minor problems with roll angle constraint violations which were not real violations. All parties signed off on the DOT. Ron expressed his concern that we needed a contingency plan for the day which Ken and Kevin can't get the daily load done in time. The group considered having a buffer observation at the end of each load which could be extended. Roger scheduled a meeting for sunday morning to review the next daily load. ACIS: Paul Plucinsky, Fred Baganoff, George Chartas, Scott Koch ACA: Tom Aldcroft, Rob Cameron, Eric Martin ============================================================================== Paul P. Plucinsky Harvard-Smithsonian Center plucinsky@cfa.harvard.edu for Astrophysics, MS 70 Phone: 617-496-7726 60 Garden Street FAX: 617-495-7356 Cambridge, MA 02138 USA Cellphone: 617-721-4366 Pager: 800-759-8352 PIN 1636493 Pager email: 1636493@skytel.com