Aug_15_1999_M25.txt Shift M25 Start at 1999:227:18:00:00 GMT = 1999 Aug 15 02:00pm EDT End 1999 Aug 15 10:00pm EDT SOT Lead Bill Podgorski SOT SC/ACA FOT-SI Eric Martin HRC-SI ACIS-SI Paul Plucinsky Plan: Running on the daily load. Complete ACIS-S Off-axis effective area measurements. Perform additional measurement at end of observation 167. EVENTS DONE OBSID -------------- ---- ----- Start Shift 227:1800 ACIS-S Off-axis Effective Area Start Y offset = 10.5 arcmin, Z offset = 0 227:1806 166 (tracking 5 stars and 3 fids) ACIS Stop science 227:2109 Set new OBSID 167 Maneuver to Y offset = 19 arcmin, Z offset = 0 227:2114 (got 5 stars and 3 fids) ACIS Stop science 228:0009 Start CAP 279 to take more ACIS data at last 228:0012 1267 pointing attitude End shift 228:0200 NOTES/ISSUES/PROBLEMS --------------------- 1) Last planned run in daily load finished at 228:0009. Wrote CAP to start another ACIS run at same off-axis position. CAP 279 executed to do this. OBSID assigned by Paul Green = 1267. 2) Reviewed DOT for next load segment. In Optical axis determination procedure it was noted that first ACIS-S observation after rad belt passage (OBSID = 1057) will produce 1Ksec of data instead of the intended 2Ksec. Bias time figured in was too little. Cal was consulted and approved.