SOT Shift Report Shift M29 Duration: 19 Aug 1999 14:00 EDT - 19 Aug 1999 22:00 EDT 19 Aug 1999 18:00 GMT - 20 Aug 1999 02:00 GMT SOT Lead: Tom Aldcroft Spacecraft/Aspect: Mark Freeman FOT/Science Liason: HRC: Gary Meehan ACIS: Paul Plucinsky ======================================== Plan ---- Dwell at RA=12.5 Dec=73.0 until ~22:30 collecting HRC internal calibration Re-start ACIS science run with CAP 318 to clock out CCDs Review load package, rebuild, approve, and uplink load. Maneuver to Cas-A and observe with ACIS-S Events ------ 18:30 Maneuver to RA=12.5 Dec=73.0 21:48 Lost fid light in slot 5 (VCDU 303477) due to cosmic ray 22:00 Use CAP 316 to activate SCS 85 to turn down HRC HV 22:30 Start CAP 318 to restart ACIS science run 22:39 Unplanned LOS, station 61 reporting sudden loss of telemetry 22:49 Regained telemetry, after switching to channel 1 22:58 Update OBSID to 62447 23:00 ACIS start science 23:30 Daily load uplinked 23:45 ACIS stop science issued 00:00 Daily load started 00:12 Maneuver to Cas-A finished: 4 stars and 3 fids acquired 00:20 ACIS bias being acquired 00:40 OBSID 472 started Notes/Issues/Problems --------------------- OFLS release 7 has a problem producing dither commands. It sets dither_mode='steady', requiring a hand-edit. This has been fixed already at the HOSC.