Aug_20_1999_H30.txt Shift H30 Start at 1999:233:02:00:00 GMT = 1999 Aug 20 10:00pm EDT End 1999 Aug 21 6:00am EDT SOT Lead Bill Podgorski SOT SC/ACA FOT-SI HRC-SI Martin Zombeck ACIS-SI Yousef Butt Plan: Continue runing HRC-S calibration source measurement via CAP 321A. Terminate ACIS science prior to loss of COMM at 322:0445. Execute CAP 325 to terminate HRC cal source measurement and start running daily load P4 at 233:0835. Start with ACIS-S Off-Axis effective area measurements. EVENTS DONE OBSID -------------- ---- ----- Start Shift 233:0200 62466 Finish ACIS CAP 322, issue stop science commands 233:0425 Loss of COMM 233:0445 AOS Goldstone 233:0808 HRC completes CAP 325 to shut off HV and go to format 2 233:0835 Load P4 starts 233:0835 CAS-A Off-Axis Eff Area Measurements Meas 1 Maneuver start 233:0857 Set OBSID = 211 233:0900 211 SSR dump starts 233:0912 (SIM FA = -594 steps) Maneuver ends, acquire 5 stars and 3 FIDS 233:0926 Start ACIS science 233:0926 End shift 233:1000 NOTES/ISSUES/PROBLEMS --------------------- 1) CAP 324 specified best ACIS-S focus of -505 steps has been implemented by K. Marsh in the P5 load. 2) P4 load starts at 233:0835 and runs thru 233:1848 Radiation Zone runs from 233:1330 - 233:2310 (approx) 3) Directories for Daily load products on HEAD-LAN: /data/mpcrit1/oac/p4/ C232:190.tlr - timeline report /data/mpcrit1/oac/p4/output/m232:1942 4) Will need to review P5 load as soon as available.