Shift L30 Start at 1999:233:10:00 = 1999 Aug 21 6:00am End 1999 Aug 21 2:00pm (Times will be given in GMT on day 233. In general times are rough, not precise.) SOT Lead/FP Sci MJ Spac/Aspect MF FOT/Sci liaison HRC ACIS Plan ---- Continue with daily load Review combined P5 and P6 load Events ------ 10:19 OBSID 212 10:22 ACIS start science 11:14 ACIS stop science 11:15 OBSID 215 11:15 ACIS start science 11:50 LOS 13:30 mission timeline report for P5P6 available for review 17:15 AOS Canberra current OBSID 216 17:22 CAP 328 -- Enable SCS 28 17:35 start upload of P5P6 daily load Notes/Issues/Problems --------------------- Future HRC plan inputs should be given to FOT mission planning in the near future. The coming week has longer duration contacts scheduled than the following week. S. Murray states that the HRC team currently have no plans for operations until the HRC-I is moved to the aim-point. OBSID 215 acquired only 4 of 5 guide stars. Missed window 7, star with nominal ACA Mag of 9.981. The star was seen initially at 10.1 mag. It was noticed that SCS 28 has been disabled since during safe-mode recovery. This SCS is needed to stop the mission SCSs in the event of PCAD going into "bright-star hold" mode and when the commanded attitude monitor is enabled. CAP 328 has been generated to enable SCS 28 at the next opportunity. The P5P6 load is planned to run from 233:22:20 to 235:22:12. No issues arose during the review. The load should go to the spacecraft at ~233:18:00. This load is build with a "best focus" position of -505 steps. The products for the P7 load should be available for review by noon EDT tomorrow. The P8 OR-list should go to FOT-MP monday before noon EDT.