Aug_28_1999_H38.txt Shift H38 Start at 1999:241:02:00 GMT = 1999 Aug 28 10:00pm EDT End 1999 Aug 29 06:00am EDT See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Aug_28_1999_H38.txt. SOT Lead Ed Kellogg SOT SC/ACA FOT-SI HRC-SI ACIS-SI (Times: hhmm or ddd:hhmm, not precise.) EVENTS PLAN DONE OBSID -------------- ---- ---- ----- LOS DSS-16, Goldstone day 241 0345 0345 1101 AOS Canberra day 241 1000 NOTES/ISSUES/PROBLEMS --------------------- At start of shift, we were AOS Goldstone, OBSID 1101. 0326 Vacuum is 2.8e-6 torr. We went LOS at 0345 as scheduled, and there were no issues being worked by SOT lead. 0642 We received word from Anil that p9 documents were ready. Review shows all ORP9_01_C.or OBSIDS and all IDs from ER_INT_ATT_P9.er were scheduled in md242:0519.dot. Also, the first few HRC observations appeared to be scheduled with the time within the requested limits, assuming HRCOFF is the duration in the DOT. However, subsequent HRC observations have HRCOFF=NONE, so it was not clear how much time was scheduled for those HRC observations.