Dec_15_1999_M145.txt Shift M145 Start at 1999:349:17:00:00 GMT = 1999 Dec 15 12:00pm EST End 1999 Dec 15 7:00pm EST See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Dec_15_1999_M145.txt. SOT Lead Bill Podgorski SOT SC/ACA FOT-SI Andy Northrup/Eric Martin HRC-SI Gerry Austin/Mike Juda ACIS-SI Paul Plucinsky/Yousaf Butt OTHER Plan: - Running load DEC1299B. Finish safing script test. Do ACIS CTI test, enter rad zone. EVENTS DONE OBSID -------------- ---- ----- Start Shift 349:1700 1508 In real-time contact, DSS-61 (Madrid) Running Safing script test per CAP 527 (see note 1) Go to NPNT mode, finish script 349:1740 1508 Set OBSID 62270 349:1818 62270 Verify ACIS in science mode taking raw mode data 349:1845 LOS DSS-61 349:1945 AOS DSS-24 (Goldstone) 349:2300 62270 Chandra status at AOS (see note 2) End of shift 350:0000 NOTES/ISSUES/PROBLEMS --------------------- 1) There was one problem during execution of the SI safing script, I_SAFEINST. When the "START SCRIPT O_PROT_SCSCTRL( "ACTI", %U38 ) line was executed the sub-script was not executed, but instead the pointer was moved to the top of the main script. This problem will be looked into by the FOT. 2) Chandra's state at AOS 349:2300 was: WAS EXPECTED PCAD MODE = NPNT NPNT CONTROL LAW FLAG = NPNT NPNT Stars: = 5 5 FIDS = 0 0 RA = 32.922333 deg 32.92233 DEC = -56.492094 deg -56.49209 ROLL = -44.333482 deg -44.33348 Format = 2 2 OBSID = 62270 62270 SIM FA = -467 -468 SIM TSC = -99615 (HRC-I) -99612 HETGA = 80.21 deg (OUT) OUT HETGB = 81.33 deg (OUT) OUT LETGA = 81.33 deg (OUT) OUT LETGB = 79.08 deg (OUT) OUT EPHIN A-leak = 0.3280 B-leak = 0.0520 ACIS = VID OFF FP Temp = -109.2 degC HRC SP PS = ON SP Top Step = 43 SP Bot Step = 54 Shield 1 HV = OFF Shield 2 HV = OFF 3) Three quick-look plots from Joy were examined and looked OK (to me). - OBSID 330, HRC-S/LETG, NGC 5548: Zero order visible - OBSID 498, ACIS-S, A2199: extended image - OBSID 495, ACIS-S, A1835: image 4) unagi went off the net for a while due to a cable problem in the junction room. This was fixed in about 2 hours.