To:sot_shift from: Dan Schwartz date: 17 Dec 99 , 12:00noon EST Subject: SOT shift report, Shift L147 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Dec_17_1999_L147.txt. Shift L147. Start at 351:13:00 GMT = 08:00am 17 Dec EST End 12:00 noon 17 Dec SOT Lead DAS (Times will be given in GMT on day 351. In general times are rough, not precise.) PLAN Continue running load DEC1299b. Performing 102Ksec observation of Lambda And, OBSID 609, with ACIS-S/HETG. Next Comms: 351:14:00 to 16:00 351:22:00 to 00:00 352:06:50 to 08:50 352:14:15 to 16:00 352:20:00 to 21:15 353:06:00 to 08:00 353:14:00 to 16:00 353:23:30 to 01:30 EVENTS Status at AOS, 351:14:02, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 354.364 deg DEC = 46.471 deg ROLL = 286.524 deg Format = 2 OBSID = 609 (Lambda Andromeda) SIM FA = -467 SIM TSC = 74424 (ACIS-S) HETG = IN ( 6.7 deg) LETG = OUT (79.1 deg) HRC-S HV is ON EPHIN: A-Leak = 0.2200 mu-a B-Leak = 0.0360 mu-a 143842 km, descending. 15:59 LOS Status at LOS was essentially unchanged from the above. NOTES/ISSUES/PROBLEMS Quick look data: following look good. OBSID 811, of Ton S180 with ACIS-S/LETG. total time 47/45 asked OBSID 624 of LP944-20 with ACIS-S total time 82/80 asked Level II board telecon. Approved loading the OBC-B with the new SI safing action. The board approved proceeding with a test of the continuous dither patch on Monday, with the proviso that the patch would then be backed out. The concern with leaving it operating was whether all the implications of changes to the ground mission planning had been considered and verified. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 800-759-8352 PIN 1636502 or e-mail 1636502@skytel.com -------------------------------------------------------