Dec_20_1999_L150.txt Shift L150 Start at 1999:354:13:00:00 GMT = 1999 Dec 20 8:00am EST End 1999 Dec 20 1:00pm EST See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Dec_20_1999_L150.txt SOT Lead Bill Podgorski SOT SC/ACA FOT-SI Eric Martin/Andy Northrup HRC-SI Jon Chappell/Gerry Austin/Mike Juda/Kathy Daigle ACIS-SI Yousaf Butt OTHER Plan: - Running load DEC1999 load. * Run ACIS CAP 528 to lower FP temp to -125 * Run CAP's 530, 531 and 532 to install, test and backout the continuous dither patch. * If time, run CAP 530, ACIS raw mode clocking test EVENTS DONE OBSID -------------- ---- ----- Start Shift 354:1300 AOS DSS-27 (Goldstone) 354:1625 62249 Chandra status at AOS (see note 1) Execute CAP 528 to lower FP temp 354:1639 Start CAP 530 for dither testing 354:1640 ACIS FP temp dropping 354:1646 Complete step 1 CAP 530 354:1700 Execte CAP 531 (Step 8A008.3 SAP 8A008) 354:1721 to load dither patch Execute step 8A008.4 of SAP 8A008 354:1743 to dither in Normal point mode 354:1801 Confirm dither 354:1803 End of shift 354:1800 NOTES/ISSUES/PROBLEMS --------------------- 1) Chandra's state at AOS 354:1625 was: WAS EXPECTED PCAD MODE = NPNT NPNT CONTROL LAW FLAG = NPNT NPNT Stars: = 5 5 FIDS = 0 0 RA = 108.000000 deg 108.000 DEC = -65.200000 deg -65.200 ROLL = 18.133244 deg 18.133 Format = 2 2 OBSID = 62249 62249 SIM FA = -467 -468 SIM TSC = -99616 (HRC-I) -99616 HETGA = 80.96 deg (OUT) OUT HETGB = 81.33 deg (OUT) OUT LETGA = 80.21 deg (OUT) OUT LETGB = 79.08 deg (OUT) OUT EPHIN A-leak = B-leak = HRC = Nominal (per HRC team) ACIS = Nominal (per ACIS team)