Dec_21_1999_L151.txt Shift L151 Start at 1999:355:13:00:00 GMT = 1999 Dec 21 8:00am EST End 1999 Dec 21 11:00am EST See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Dec_21_1999_L151.txt SOT Lead Bill Podgorski SOT SC/ACA FOT-SI HRC-SI ACIS-SI OTHER Plan: - Running load DEC1999C load. Uplink SI safing patches to CPU-B. EVENTS DONE OBSID -------------- ---- ----- Start Shift 355:1300 AOS DSS-27 (Goldstone) 355:1425 62260 Chandra status at AOS (see note 1) Upload SI Safing patch to OBC-B - start 355:1510 LOS DSS-27 355:1553 End of shift 355:1600 NOTES/ISSUES/PROBLEMS --------------------- 1) Chandra's state at AOS 355:1425 was: WAS EXPECTED PCAD MODE = NPNT NPNT CONTROL LAW FLAG = NPNT NPNT Stars: = 5 5 FIDS = 0 0 RA = 108.004115 deg 108.00410 DEC = -65.199381 deg -65.19937 ROLL = 17.792705 deg 17.79270 Format = 2 2 OBSID = 62260 62260 SIM FA = -467 -468 SIM TSC = -99616 (HRC-S) -99616 HETGA = 80.96 deg (OUT) OUT HETGB = 81.33 deg (OUT) OUT LETGA = 80.21 deg (OUT) OUT LETGB = 79.08 deg (OUT) OUT EPHIN A-leak = 0.3520 B-leak = 0.0560 HRC SP PS = OFF IM PS = ON IM Top Step = 0 IM Bot Step = 0 Shield 1 HV = OFF Shield 2 HV = OFF ACIS FP Temp = -109.2 deg C DEA Pwr = 53.6 watts DPA Pwr = 41.0 watts GSE Status = Clocking data 2) 9:00am Meeting notes: - 2 supports yesterday, 1 long - 3 recorder dumps, 1 bad on DSS-27, able to recover and are all caught up - One weekly load segment uplinked - Continuous Dither testing completed successfully yesterday - ACIS FP temp reached -122.9 last night (see H151 rpt) 3) Note from yesterday's 9:00am - JPL network server failure caused non-retrievable loss of data, about 12.5 minutes, from 353:1603:06 to 353:16:15:40