Shift A6, 7/27/99 20:19 EDT to 7/28/99 09:19 EDT SOT Lead WAP Spac/Aspect RAC FOT/Sci liason EM HRC AK, RK ACIS PP,MB,RG,GG,etc. ACTIVITY PLAN Complete ACIS Raw Data collection test, each CCD, 61054_RAW_DATA Perform ACIS OBF Integrity Test, 61053_OBF_INTG Start ACIS Dark Current Measurement Test, 61052_DARK_CUR Perform Vacuum measurement, SOP 6M002 Re-acquire all 4 FID lights using SAP 6A024, CAP91A Perform SSR Dump (CAP 68A) ANALYSIS Activities ACA Alignment evaluation EVENTS (all times approximate) 209:01:30 Complete ACIS Raw Data collection test, each CCD, 61054_RAW_DATA (OBSID's 62795, 62794, 62793 and 62792) 209:02:30 - 209:03:00 Commanding problems, recycle PTP to improve 209:03:10 - 209:03:22 Ground station swap, Madrid to Goldstone. 209:03:30 Start ACIS OBF Integrity Test, 61053_OBF_INTG (OBSID's 62791, 62790, 62789 and 62788) 209:04:28 Loss of comm 209:04:38 Start SSR Dump 209:05:10 Apogee #5 209:05:30 Complete ACIS OBF Integrity Test (IT IS THERE!) 209:05:50 Start ACIS Dark Current Measurement, 61052_DARK_CUR OPSID FP Temp 62787 -90C 62786 -90C 62785 -90C 62784 -90C 209:06:09 Ran CAP 91A which runs SAP 6A024 to re-acquire FID lights, VCDU 1616900 209:06:10 FLCA Reset, VCDU 1617600 209:06:13 PEA full field search, 4 FIDS and 4 MON windows found, VCDU 1617900 209:06:15 Establish 8x8 windows, VCDU 1618360 (Total time of 6 minutes for script) 209:06:22 Turn on Vacuum monitor 209:08:00 Do 167 deg yaw maneuver to prepare for Earth scan 209:09:20 Telemetry paused on coot due to attempt to read 70 MByte file into emacs Resumed after 2 minutes. 209:10:00 Continue ACIS Dark Current Measurement, 61052_DARK_CUR OPSID FP Temp 62783 -110C 62782 -110C 62781 -110C 62780 -110C 209:11:23 Vacuum monitor off 209:12:16 ACIS Dark current over at -110C (Safe for rad belt passage) 209:12:35 Set ACIS FP temp to -120C 209:12:36 Run CAP 70 Step 1 to disable RADMON (after ACIS finishes measurement) (run CAP 70 after radiation belt to ENABLE RADMON) NOTES/ISSUES/PROBLEMS Lack of either DAT or JAZ drive on unagi is impeding ACA & S/C analysis work. It was determined that the on-line ephermis information used by mission planning, PCAD and CCDM for shift A6 was incorrect by 1.5 hrs. The cause appears to be the use of the wrong day as input to the Satellite Tool Kit (STK) orbit analysis program. This was corrected by Flight systems. Received a revised Transfer Orbit Timeline for review. Distributed to SOT, ACIS, HRC, ACA groups. NOTE: PCAD will execute pitch maneuvers which should be watched closely for stray light levels. Time Pitch 209:14:10 Beta = -45, pitch = 135 deg (SUN away from HRMA) 209:15:50 Beta = +45, pitch = 45 deg (SUN towards HRMA) 209:18:40 Beta = +55, pitch = +35 deg (SUN towards HRMA) 209:21:00 Beta = +45, pitch = 45 deg 209:21:37 Beta = 0, Normal SUN mode Did not run CAP 93 this orbit (not needed since all HRC HV now OFF per HRC team).