Nov_02_1999_M102.txt Shift M102 Start at 1999:306:19:00:00 GMT = 1999 Nov 02 2:00pm EST End 1999 Nov 02 6:00pm EST See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Nov_02_1999_M102.txt. SOT Lead Bill Podgorski SOT SC/ACA FOT-SI HRC-SI ACIS-SI OTHER Plan: - Running P24c load, uplink OTG patches (use B side Pot with MCE-A) EVENTS DONE OBSID -------------- ---- ----- Start Shift 306:1900 419 Out of contact at start of shift AOS DSS-54 306:2200 419 ----- Real time------ DSS-54 (Madrid) State was nominal at AOS (see Note 1) Uploaded OTG Patches per steps 1-3 of CAP 499 306:2220 LOS 306:2300 End of shift 306:2300 NOTES/ISSUES/PROBLEMS --------------------- 1) Chandra's state at AOS: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 137.874211 deg DEC = 5.824736 deg ROLL = 74.040431 deg Format = 2 OBSID = 419 SIM FA = -467 (ACIS-S == -468) SIM TSC = 75623 (ACIS-S == 75620) HETGA = 80.96250 deg (OUT) HETGB = 81.33750 deg (OUT) LETGA = 80.96250 deg (OUT) LETGB = 79.08750 deg (OUT) EPHIN A-leak = 0.2000 B-leak = 0.0320 ACIS = On + taking data HRC = HRC-S HV On at steps 43 (TOP) and 54 (BOT) This is 1/2 up and nominal for current setup per S. Murray TE and VE rates are all 0 HRC-I HV Off HRC-Shield HV Off 2) OTG Patches: OTG patches to use B side pot in logic tests with MCE-A will be uploaded during COMM at 306/2200 (this shift), steps 1-3 of CAP 499. Patches will be tested via CAP 499 on the newly scheduled COMM tomorrow am (307/1130GMT, 0630am EST). 3) SOT Area: The SOT area will be re-configured sometime during the next couple of days to provide more working space and room for the new GRETA PC. This PC is in the TST room now (in the thermal area) but not quite ready to use (Bruce is working out some software issues). The PC will be moved to our SOT area after the re-configuration of space is complete.