To:sot_shift from: Dan Schwartz date: 17 Nov 99 , 12:00noon EST Subject: SOT shift report, Shift L117 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Nov_17_1999_L117.txt. Shift L117. Start at 321:13:00 GMT = 08:00am 17 Nov EST End 12:00 noon 17 Nov SOT Lead DAS (Times will be given in GMT on day 321. In general times are rough, not precise.) PLAN Continue running load p26b. We should have finished the ACIS CTI measurement, OBSID 63898, and now be doing NGC7293, OBSID 631, with ACIS-S. At 22:37 we will maneuver to the anti-Leonid orientation. We will continue to watch solar activity, which is high. Comm passes planned at 16:00 to 16:45 23:25 to 04:50 and 322:06:00 to 08:00. 322:14:00 to 16:00 EVENTS Status at LOS 321:10:53, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 324.991 deg (ACIS CTI, DEC = -30.016 deg near Leonid ROLL = 288.002 deg antiradiant) Format = 2 OBSID = 63898 SIM FA = -467 SIM TSC = -99616 (HRC-S) HETG = OUT (80.6 deg) LETG = OUT (79.1 deg) HRC both HV are OFF EPHIN: A-Leak = 0.3280 mu-a B-Leak = 0.0520 mu-a 15:52 AOS Status at 321:16:01, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 4 FIDS = 3 RA = 337.387 deg (NGC 7296) DEC = -20.825 deg ROLL = 296.332 deg Format = 2 OBSID = 631 SIM FA = -467 SIM TSC = 75623 (ACIS-S) HETG = OUT (80.6 deg) LETG = OUT (79.1 deg) HRC both HV are OFF EPHIN: A-Leak = 0.3400 mu-a B-Leak = 0.0520 mu-a NOTES/ISSUES/PROBLEMS At about 13:00, the ACE proton flux (130-214 keV) was holding around 300 per (cm^2 s MeV ster), after falling over the last 6 hours from a peak flux near 10^4. We are still eperiencing high solar activity, with coronal mass ejections possibly hitting earth on Nov 17 and 19. From http://www.dxlc.com/solar/: "On November 17: A major flare was observed at 09:57, it reached the M7.4 level." "Region 8765 developed further and is a very complex region capable of producing a major proton flare." Notes from 9am meeting. OFLS 8.0 has been delivered. We are waiting on the new 3.6 delivery of the ONLS at which time both will be installed on string 3 and testing will begin. Had 3 good SSR playbacks in last 24 hours, loaded another part of p26b. There are 3 more parts to complete p26b, two more planned to go up in next 24 hours. Personnel are set for covering Leonid encounter this evening, with people off-shift ready to come in early-am tomorrow if needed. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 800-759-8352 PIN 1636502 or e-mail 1636502@skytel.com -------------------------------------------------------