To:sot_shift from: Dan Schwartz date: 2 Sep 99, 06:00am EDT Subject: SOT shift report, Shift H42 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Sep_01_1999_H42.txt. Shift H. Start at 245:02:00 GMT = 10:00pm 01 Sep EDT End 06:00am 02 Sep SOT Lead DAS Spac/Aspect FOT/Sci liason HRC ACIS (Times will be given in GMT on day 245. In general times are rough, not precise.) PLAN Running under load P10 HRC to repeat shutter focus measurements at nominal aim point. Move to corner of HRC-I and perform shutter focus measurement, in order to measure SIM tilt. EVENTS Start shift LOS. 04:41 AOS. OBSID is 1261. Maneuver is finishing. Acquire 5 stars and 3 fid lights! Target is HR1099. SIM focus -699, SIM translation at -29025 (offset 21479) 05:06 OBSID 1211, SIM translation = -50504 (nominal HRC-I aim point) 05:53 OBSID 1212, 05:57 Finish SSR playback, only got half of dump, will restart later 06:40 OBSID 1213. Tracking 5 stars, 1 fid light. 2 fids must have been shadowed by the shutter blades. 07:21 Finish SSR playback, reset the pointers. 07:26 OBSID 1214. 5 stars, 1 fid light. 08:13 OBSID 1215. Manuever SIM to -71985. Acquire 5 stars, 2 fid lights. 09:00 LOS NOTES/ISSUES/PROBLEMS Our GRETA terminal has disappeared. We would like it back. HRC status 2IMCLST, imaging detector HVPS current limit enable, was giving an exception advisory. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 800-759-8352 PIN 1636502 or e-mail 1636502@skytel.com -------------------------------------------------------