Sep_01_1999_L41.txt Shift L41 Start at 1999:244:10:00 GMT = 1999 Sep 01 06:00am EDT End 1999 Sep 01 02:00pm EDT SOT Lead Ed Kellogg SOT SC/ACA Tom Aldcroft FOT-SI HRC-SI ACIS-SI (Times: hhmm or ddd:hhmm, not precise.) Plan: continue p9b load until 3:39 pm EDT, start p10 at 6 pm EDT. EVENTS PLAN DONE OBSID -------------- ---- ---- ----- AOS DSS-61 1035 1035 62396 Review p10 load 1600 NOTES/ISSUES/PROBLEMS --------------------- At start of shift, we were LOS. 1220 Vacuum is 4.1e-6 torr. At 9:00 standup meeting: * There will be a Level 2 board at 2:00 pm today for ACA * Will we be able to get the patch for the grating deployment to the Level 2 board today? It doesn't require a new checksum, since it's to a data area for a K constant change for the grating motor voltage. * Ken said there's a problem with SOE file headers. He would re-generate the file to see if it can be righted. * p10 load to be reviewed at 1:00.