Sep_03_1999_L43.txt Shift L43 Start at 1999:246:10:00 GMT = 1999 Sep 03 06:00am EDT End 1999 Sep 03 02:00pm EDT SOT Lead Ed Kellogg SOT SC/ACA Tom Aldcroft FOT-SI HRC-SI (Times: hhmm or ddd:hhmm, not precise.) Plan: continue p9b load until 3:39 pm EDT, start p10 at 6 pm EDT. EVENTS PLAN DONE OBSID -------------- ---- ---- ----- AOS, unscheduled comm for CAP 352A 1509 62394 Contact terminated 1527 AOS 1800 1800 171 NOTES/ISSUES/PROBLEMS --------------------- At start of shift, we were AOS. Contact ended at 1315. HRC arranged a special contact at 1530 at the optimum time for the Cas A observation, during a maneuver, to execute CAP 352A, focus to -700 steps. Short bits of TLM indicated success getting to -700. Report from 9 am s/c meeting: from SOC - past 24 hrs - no SCS loads CAPS 375 HRC shutter open,352 SIM focus HRC,374 patch OTG motor calib,379 clear SCS 193 & 247. Lost data from 1906-30 - gateway crash at JPL 1940 ACA common column error from FOT MP - HRC shutter blocking fids will be cured by a fix in command sequence definition in load generator P11 load was to be ready for review at noon; now we're not sure. It needs to be uplinked ~6 am Sat. Review will be 4 hrs after release of review package. from CXC DP - 1/4 sec timing error fixed last night, will cause a discontinuity. from SOT/HRC(MJ) - HRC CAPs for Saturday 352A Adjust SIM focus position 354A Set dither amplitudes to either 0 or 20 arcsec 376 Turn on HRC-S HV & raise to operating level 377 Scan HRC shutters 378 HRC-S Shutter focus LETG release is now planned for 6 pm Sunday, Sep 5 (per p11 OR draft).