Sep_09_1999_H50.txt Shift H50 Start at 1999:253:02:00:00 GMT = 1999 Sep 09 10:00pm EDT End 1999 Sep 10 06:00am EDT SOT Lead Bill Podgorski SOT SC/ACA FOT-SI HRC-SI ACIS-SI Royce Buehler, Jim Francis, Paul Plucinsky Status/Plans: ------------ - Running P12D load, LETG/HRC-S plate focus on Capella, HRC-I science target (Cen A) - During COMM period (0740 - 0915) go to fmt 2 and perform ACIS PRAM and SRAM dumps.Then back to fmt 1 and do SSR dump. - Detailed timeline plan for pass: 0715 Intermediate maneuver start 0733 Final maneuver for OBS 463 starts 0736 Set OBSID to 463 0740 COMM starts | ACIS dumps PRAM 0815 LETG Retract start | and SRAM 0817 Start ACIS command (in load) | per CAP399 0817 Start SIM TSC move to HRC-I (-50,505 steps) | Dump SSR 0820 Start SIM FA move to -836 steps 0821 Change FID configuration to HRC-I 0830 HRC-I Observation start 0915 COMM ends EVENTS DONE OBSID -------------- ---- ----- Start Shift 253:0200 ----- Out of Contact------ Change OBSID to 463 253:0736 463 AOS DSS-24 253:0740 ----- Real time------ To Format 2 253:0744 Start CAP 399 253:0744 Complete Download of ACIS PRAM and SRAM 253:0803 Finish CAP 399 and return to Format 1 253:0810 Start SSR Dump 253:0810 LETG Retract Start 253:0815 Complete 253:0820 SIM TSC Move to -50505 253:0820 SIM FA Move to to -835 253:0822 Go to Normal Point Mode 253:0822 ( Acquire 5 stars and 3 FIDS) HRC-I starts coming ON 253:0830 HRC-I events coming in 253:0836 SSR Dump complete 253:0853 LOS DSS-24 ----- Out of Contact------ End of shift 253:1000 NOTES/ISSUES/PROBLEMS --------------------- 1) At AOS the spacecraft configuration was nominal. It was in NMM with OBSID = 463. The SIM TSC was at -99616 and the FA at -747. There were no stars or FIDS observed (due to being in NMM). 2) ACIS executed CAP 399 to dump their PRAM and SRAM ( Program RAM and Sequencer RAM) as a diagnostic procedure.