Sep_13_1999_M53.txt Shift M53 Start at 1999:256:22:00 GMT = 1999 Sep 13 06:00pm EDT End 1999 Sep 13 12:00pm EDT SOT Lead Ed Kellogg FOT-SI ACIS Yousaf Butt HRC-SI (Times: hhmm or ddd:hhmm, not precise.) Plan: complete ACIS bakeout, cool ACIS back down, do event histograms and faint mode data collection with ACIS. Also review next p load at 11 pm. EVENTS DONE OBSID -------------- ---- ----- AOS 2215 62421 ACA shows 5 stars, no fids 2245 Start CAP 429, Move SIM TSC to -99620, HRC-S for ACIS event hist 0033 OBSID change in CAP 429, I event hist 0102 62420 OBSID change in CAP 429, S event hist 0208 62419 OBSID change in CAP 429, TE faint S2-S3 window 0258 62418 NOTES/ISSUES/PROBLEMS --------------------- 2215 We approved CAP 426 to increase grating retraction cycle duration from 6 to 9 minutes, to address the problem of power not being turned off after retraction. 2245 We approved ACIS CAP, 429 for event histograms and faint mode data collection after it is cooled back down to be executed at 257:0200, 257:0220. 0038 SIM move ended up at TSC=-99608. 0300 p14 review telecon: Wallace Jackson emphasized that there should be no load changes from 24 hr before, or during eclipse. This means that there should be no events like ACIS bakeout during that time. The entire p14 load has essentially one long observation of HR1099, broken into two obsids, 64 before eclipse, and 1252 after, with ACIS-S and HETG. Several issues are outstanding as of end of this telecon, including the need for a review with ACIS, so final review will take place tomorrow AM.