Sep_21_1999_H61.txt Shift H61 Start at 1999:265:08:30:00 GMT = 1999 Sep 22 4:30am EDT End 1999 Sep 22 7:00am EDT SOT Lead Bill Podgorski SOT SC/ACA FOT-SI HRC-SI ACIS-SI Plan: Medium eclipse during real time contact, in rad belts Running P17b load. EVENTS DONE OBSID -------------- ---- ----- Start Shift 265:0830 62381 ----- Real time------ DSS-24 (Goldstone) In radiation belts, See note 1 for state Start eclipse 265:0928 End eclipse 265:1032 Recover (see note 2) 265:1055 End of shift 265:1100 NOTES/ISSUES/PROBLEMS --------------------- 1) Chandra configuration at 265:0830 was nominal with parameters as follows: PCAD MODE = NPT Stars: = 4 (Guide star in 4th of 5 slots trying to re-acquire) FIDS = 0 RA = 268.200000 DEC = -61.500000 ROLL = -90.904436 Format = 2 OBSID = 62381 SIM FA = -535 SIM TSC = -99616 (HRC-S) HETGA = 81.3 (OUT) HETGB = 81.7 (OUT) LETGA = 81.7 (OUT) LETGB = 79.8 (OUT) ACIS = VID Boards OFF HRC = All HV OFF 2) Eclipse performance was again nominal, within predictions plus error bars. The maximum bus voltage after eclipse exit was under 33.8 volts. Minimum bus voltage was about 28 volts.