Sep_23_1999_M63.txt Shift M63 Start at 1999:266:12:40 GMT = 1999 Sep 23 8:40am EDT End 1999 Sep 20 5:00pm EDT SOT Lead Ed Kellogg ACA/SC Tom Aldcroft, Rob Cameron FOT-SI Eric Martin ACIS Yousaf Butt HRC-SI (Times: hhmm or ddd:hhmm, not precise.) Plan: Continue with load EVENTS day 266 DONE OBSID -------------- ---- ----- AOS, 3 fids, 5 stars 1930 106 Uplinking daily load 1946 Begin CAP to dump PEA memory 1953 Begin uploading patch 39 2004 Begin post-uplink dump 2008 End dump 2009 ACA still tracking 3 fids, 5 stars 2014 Verify patch is working 2015 NOTES/ISSUES/PROBLEMS --------------------- We started the shift LOS. S/C state: 0745 GMT 1942 GMT --------- -------- PCAD MODE= NPNT,KALM NPNT,KALM Stars: = 5 5 FIDS = 3 3 RA = 303.1686 est. 287.941 DEC = -56.8369 est. 5.003 ROLL = -60.928 est. -91.577 Format = 2 OBSID = 513 SIM FA = -535 -467 SIM TSC = -99616 75625 HETG = 81, 82 (out) 8, 7 (in) LETG = 82, 80 (out) 82, 80 (out) On the dump prior to uplinking the patch, we got CB4E, not correct, looks like bad TLM, so we do the dump again. On the second try, the dump confirmed the correct readback. Next, proceed with uplinking per CAP 446. Post uplink dump OK, and ACA is tracking satisfactorily. We now need to consider how often we check to see that the patch is still working, and we need to make the patch a part of PEA startup. We also notified Flight Software that it's been accomplished. Summary from 9 am meeting ------------------------- Ron Felice has a candidate for the deputy Flight Operations Manager position. Dan Muleady will be returning to TRW west on Sunday. A software class by Linda Yester needs to be arranged. Chuck Smith has CAP 446 for ACA PEA patch 39 on his desk for FD approval (it was approved at 9:45 am, thanks, Roger!). We plan to uplink it during the pass beginning at 3:30 pm EDT today. The Cmd1 server had a panic and reboot(again) - an HPR is contemplated. Ken Gage has rebuilt p17c out for review, with approval meeting scheduled for noon. Kevin is working p18, status not yet known.