Sep_28_1999_L67.txt Shift L67 Start at 1999:271:11:00 GMT = 1999 Sep 28 7:00am EDT End 1999 Sep 28 12:00pm EDT SOT Lead Robert Cameron ACA/SC Tom Aldcroft FOT-SI ACIS HRC-SI Mike Juda (Times: hhmm or ddd:hhmm, not precise.) Plan: Adjust OBC Ephemeris Time offset. Fine attitude initialization. Start ACIS-S + HETG long observation of E0102-72.3 Close HRC door in preparation for radiation passage. We started the shift AOS. S/C state: 1100 GMT -------- PCAD MODE= Normal Sun Mode NSUN,SPNT Stars: = 4 (had been 8 from ACA full-field search) FIDS = 0 RA = 79.2059 est. DEC = 45.9794 est. ROLL = 98.062 est. Format = 2 OBSID = 62373 SIM FA = -535 SIM TSC = -99608 (HRC-S) HETG ANG = 81, 82 (out) LETG ANG = 82, 80 (out) HRC = safed ACIS = CTI measurements on external cal sources, FP @-110C EVENTS day 271 ACTIVITY OBSID --------------- -------- ----- 271/1100 - 272/0100 COMM 271/0000 - 271/1510 ACIS CTI 62375,62374,62373 271/1450 CAP 455: Ephemeris Time offset uplink (KP.ET_OFFSET = 23267076.0) 271/1540 On-board attitude initialization 272/0259 ORBIT APOGEE NOTES/ISSUES/PROBLEMS --------------------- The E0102-72.3 (ACIS-S + HETG) observation will be 165 kseconds. Daily load P19B is currently scheduled to start at 1999:272:22:03