To:sot_shift from: Dan Schwartz date: 30 Sep 99 , 11:00am EDT Subject: SOT shift report, Shift L69 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Sep_30_1999_L69.txt. Shift L69. Start at 273:11:00 GMT = 07:00am 30 Sep EDT End 11:00am 30 Sep SOT Lead DAS Spac/Aspect FOT/Sci liason HRC ACIS (Times will be given in GMT on day 273. In general times are rough, not precise.) PLAN Out of Comm. Continue running P19d, finish passage through radiation belts, perform ACIS CTI measurements. EVENTS NOTES/ISSUES/PROBLEMS We think CAP 446 to load patch 39 has still not been run. This patch to the ACA software prevents the fid light loss. It needs to be run in NPM tracking stars and fids, and that doesn't happen again until after 273:20:45 (4:45pm today). The next comm passes after that are very short ones at 3:20am and 1:50 pm on Friday -- I don't know how long the load actually takes. HRC has prepared CAP 460 to open their door, prior to the series of AR LAC gain measurements which will take place in load P20. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 800-759-8352 PIN 1636502 or e-mail 1636502@skytel.com -------------------------------------------------------