To:sot_shift from: Dan Schwartz date: 14 Apr 00 , 12:00noon EDT Subject: SOT shift report, Shift L266 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Apr_14_2000_L266.txt. Shift L266. Start at 105:12:00 GMT = 08:00am 14 Apr EDT End 12:00 noon 14 Apr SOT Lead DAS (Times will be given in GMT on day 105. In general times are rough, not precise.) PLAN Continue running load APR0900e. Finish OBSID 635, ACIS-I observation of the rho Ophiuchus dark cloud. Then do ACIS-I observations of Ophiuchi mosaic, OBSID 619; V1494 Aql, OBSID 959; ACIS-S of NGC 5055, OBSID 413; and ACIS-I of A1689, OBSID 540; and Virgo Cluster, OBSID 517. Then we will do ACIS CTI measurement on 106:11:34 prior to belt entry. On belt exit, we will perform the real-time CAP 595 to do ACIS squeegy mode Test II. Next Contacts 105:19:00 to 20:05 106:05:10 to 07:10 106:14:00 to 15:00 106:22:20 to 02:30 ACIS Squeegy test II. 107:06:00 to 07:00 107:15:15 to 16:15 108:00:30 to 01:15 108:10:00 to 12:00 108:20:45 to 21:45 EVENTS Status at LOS, 105:10:48 was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 246.834 deg DEC = -24.600 deg ROLL = 78.095 deg Format = 2 OBSID = 635 (Rho Ophiucus Core) SIM FA = 535 SIM TSC = 92903 (ACIS-I) HETG = OUT (80.2 deg) LETG = OUT (78.7 deg) HRC-S HV is ON EPHIN: A-Leak = 0.3000 mu-a B-Leak = 0.0480 mu-a ACIS focal plane temperature at LOS was -119.7 14:25 Descending through 142693 km. NOTES/ISSUES/PROBLEMS Still no quick look data, since there are no OBSPAR files due to a database problem. Notes from the 9am status meeting: Three supports yesterday, 3 good SSR dumps, but antenna 46 had to be used at 256 kHz as has been the case recently. They report a signal strength 8db less than is expected -- this is not due to any cause on Chandra. Yesterday we ran CAP 563a to dump the CPE warm start count. It is still reading 1 as expected. A review of CAP 595, for ACIS squeegy mode Test II, is planned for 5pm this afternoon. APR1600c products are out, load review will be at 11am this morning. Products went out for the DEC1299 load, to test 8.1a. Load review being planned, probably for 4pm this afternoon. Roger reported plans for accepting the next ONLS/OFLS revisions. The ONLS rev 3.7 will be delivered April 17 (provisionally) and May 15 ("official" delivery). It will be installed and verified on the third string. The OFLS will deliver what is called 9.0 on May 22 -- but this delivery will not contain ANY of the 9.0 content in Mission Planning. So we have a low risk that OFLS problems will delay promotion of 3.7 to the operating string. Then OFLS delivery 9.1, which will contain all the planned release 9 content in Mission planning area, will be delivered in late June, tested on the third string, undergo three full load reviews as part of its test cycle, and be installed in early Sept. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 800-759-8352 PIN 1636502 or e-mail 1636502@skytel.com -------------------------------------------------------