Jan_14_2000_M175.txt Shift M175 Start at 2000:014:21:00:00 GMT = 2000 Jan 14 4:00pm EST End 2000 Jan 14 6:00pm EST SOT Lead Mark Freeman SOT SC/ACA FOT-SI HRC-SI ACIS-SI Paul Plucinsky OTHER Plan: - Running load JAN0900B load, running ACIS-S observation 625. Run CAP 545 to remove SCS 160. 2000:015:13:04:42.874 61 EAPOGEE ORBIT APOGEE 2000:016:20:48:26.203 61 EPERIGEE ORBIT PERIGEE EVENTS DONE OBSID -------------- ---- ----- Start Shift 014:2100 AOS DSS-24 (Goldstone) 014:2250 625 Chandra status at AOS was nominal Disable and clear SCS 160 (See note 2) 014:2310 End of shift 014:2320 LOS DSS-24 (expected) 015:0020 NOTES/ISSUES/PROBLEMS --------------------- 1) Chandra snapshot browser is NOT working due to a failed disk. Rob in the process of fixing it. 2) SCS 160 for lowering the ACIS focal plane temperature setpoint to -130C was executed today so the SCS was cleared. Current ACIS focal plane temp. is -120.7C and slowly moving downward.