To:sot_shift from: Dan Schwartz date: 07 Mar 00 , 12:00noon EST Subject: SOT shift report, Shift L228 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Mar_07_2000_L228.txt. Shift L228. Start at 67:13:00 GMT = 08:00am 07 Mar EST End 12:00 noon 07 Mar SOT Lead NONE (das at CXC staff meeting) (Times will be given in GMT on day 67. In general times are rough, not precise.) PLAN Continue running load MAR0500d. Finish CTI measurements, Do OBSID 348, ACIS-S on NGC 4151, followed by ACIS-S observations of SN1998s (OBSID 768), NGC 4258 (OBSID 349), and the Crab Nebula (OBSID 769). Next is an HRC-S/LETG calibration observation of Capella, (OBSID 58), until 068:16:44. Next Contacts: 067:13:30 to 15:30 068:00:40 to 02:40 068:10:30 to 12:15 068:10:30 to 12:00 068:19:25 to 20:50 EVENTS Status at LOS, 067:04:44 was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 0 RA = 281.530 deg DEC = 76.955 deg ROLL = 65.456 deg Format = 2 OBSID = 62135 (ACIS CTI) SIM FA = -467 SIM TSC = -99616 (HRC-S) HETG = OUT (81.0 deg) LETG = OUT (79.1 deg) HRC-I HV is ON EPHIN: A-Leak = 0.2600 mu-a B-Leak = 0.0400 mu-a 13:30 AOS 15:30 LOS Status at LOS, 067:15:29 was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 182.660 deg DEC = 39.412 deg ROLL = 155.472 deg Format = 2 OBSID = 348 (NGC 4151) SIM FA = -467 SIM TSC = 75623 (ACIS-S) HETG = OUT (81.0 deg) LETG = OUT (79.1 deg) HRC-I HV is ON EPHIN: A-Leak = 0.2840 mu-a B-Leak = 0.0480 mu-a 17:25 Ascending through 113812 km. NOTES/ISSUES/PROBLEMS From 9am status meeting: 3 supports, 3 dumps. Ran CAP 468 to dump the eps memory locations. We went through eclipse #5 of the current season, everything nominal. Products for the MAR1200 load were out yesterday, review at 2pm today. This is the first review conducted under OFLS 8.0. Kevin is working on the MAR1900 load. Cambridge Ops had planned the monthly data base backup at 11am today, but it will be postponed until tomorrow because of the on-going Mar0500 work. Level II board yesterday approved the change of P4GM ephin threshold K-constant. This allows proceeding with the change to shorten the radiation belt pad times to 10 Ksec. Change to SCS 105 was discussed, and some further work defined to null out the commmands at the end. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 800-759-8352 PIN 1636502 or e-mail 1636502@skytel.com -------------------------------------------------------