To:sot_shift from: Dan Schwartz date: 21 Jun 02, 12:00noon EDT Subject: SOT shift report 2002-06-21 L1065 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Jun_21_2002_L1065.txt. Shift L1065. Start at 172:12:00 GMT = 08:00am 21 Jun EDT End 12:00 noon 21 Jun SOT Lead DAS (Times will be given in GMT on day 172.) PLAN ---- Continue running load JUN1702C. Continue the series of E0102-72.3 calibration observations with ACIS-I, obsid's 2857 through 2864. No comm this shift. Next Comms: 172:1840 to 2040 173:0520 to 0620 173:1215 to 1315 173:1900 to 2000 174:0230 to 0330 174:1240 to 1440 174:2205 to 2305 175:0825 to 0925 175:1735 to 1835 176:0200 to 0300 176:1100 to 1200 Orbital events: 2002:173:02:08:54.088 397 ORBIT APOGEE 2002:174:09:53:00.071 397 ORBIT PERIGEE 2002:175:17:36:24.353 398 ORBIT APOGEE 2002:177:01:21:33.978 398 ORBIT PERIGEE 2002:178:09:04:39.928 399 ORBIT APOGEE 2002:179:16:49:28.197 399 ORBIT PERIGEE 2002:181:00:32:59.733 400 ORBIT APOGEE EVENTS ------ Status at LOS, 172:10:08, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 16.217 deg Dec = -71.953 deg ROLL = 112.802 deg Format = 2 OBSID = 2860 E0102-72.3 calibrations SIM FA = -535 SIM TSC = 92903 (ACIS-I) HETG = OUT (79.46 deg) LETG = OUT (77.96 deg) HRC-I HV is ON EPHIN Geom = LARG E1300 = 0.0 LT 10.0 (RADMON P4GM = 0.0 LT 300. Triggers) P41GM = 0.0 LT 8.47 A-leak = 1.0200 mu-a B-leak = 0.5480 mu-a Ascending through 109925 km. ACIS focal plane temperature -119.7. NOTES/ISSUES/PROBLEMS From the 9am status meeting: In last 24 hours, three 34m supports, no problems. First segment of JUN2402C was uplinked, on-board loads good until 176:11:00. JUN2402C loads were approved yesterday. OFLS 9.3 is on-line and will be used for the JUL0102 planning. Kevin Marsh will be acting Mission Planning manager until after July 8, while Ken Gage is out. Followup to thermal analysis meeting: Tan and Rino talked to Adcole, maker of the fine sun sensor, and were told that it can go up to 85 deg C. Our current red limit has been 75 deg C. This information needs to be properly documented. ASVT testing yesterday successfully tested the IRU calibration K-constant patch. The Flight Director's CCB yesterday approved the closeout report for the ACA Bright Background Anomaly, and the Backout Patch for IRU Calibration K-Constant Patch. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- 2851 E0102-72.3 S3 170:19:01 ACIS-S NONE Looks good 2852 E0102-72.3 S1 170:21:24 ACIS-S NONE Looks good 3712 A3158 171:00:04 ACIS-I NONE Looks good 2544 HD169978 172:01:20 ACIS-I NONE Looks good ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 877-693-7198 PIN 693-7198 or e-mail 6937198@archwireless.net -------------------------------------------------------