To:sot_shift from: Dan Schwartz date: 30 Oct 02, 12:00noon EST Subject: SOT shift report 2002-10-30 L1196 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Oct_30_2002_L1196.txt. Shift L1196. Start at 303:13:00 GMT = 08:00am 30 Oct EST End 09:30am 30 Oct SOT Lead DAS (Times will be given in GMT on day 303.) PLAN ---- Continue running load OCT2802B. Do ACIS CTI measurements surrounding the perigee passage. First observation of orbit 447 will be ACIS-I obsid 3196, the distant cluster MACS-J0647.7+7015 to determine distances using the SZ effect, and to study cluster evolution. No Comm this shift. Next Comms: 303:1825 to 1925 304:0400 to 0500 304:1310 to 1510 304:2250 to 0050 305:0650 to 0750 305:1730 to 1830 306:0155 to 0355 306:1300 to 1400 306:2200 to 0000 307:0900 to 1000 307:1800 to 1900 Orbital events: 2002:303:23:43:07.851 446 ORBIT PERIGEE 2002:305:07:26:21.998 447 ORBIT APOGEE 2002:306:15:09:55.723 447 ORBIT PERIGEE 2002:307:22:53:37.494 448 ORBIT APOGEE 2002:309:06:36:37.528 448 ORBIT PERIGEE 2002:310:14:20:21.810 449 ORBIT APOGEE 2002:311:22:04:27.069 449 ORBIT PERIGEE 2002:313:05:47:41.863 450 ORBIT APOGEE 2002:314:13:32:14.111 450 ORBIT PERIGEE EVENTS ------ Status at LOS, 303:11:48, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 149.541 deg Dec = -11.107 deg ROLL = 80.216 deg Format = 2 OBSID = 3205 Abell 907 SIM FA = -535 SIM TSC = 92903 (ACIS-I) HETG = OUT (79.46 deg) LETG = OUT (77.96 deg) HRC-S HV is ON EPHIN Geom = LARG E1300 = 0.2 LT 10.0 (RADMON P4GM = 0.2 LT 300. Triggers) P41GM = 0.0 LT 8.47 A-leak = 1.0200 mu-a B-leak = 0.5720 mu-a Descending through 93107 km. ACIS focal plane temperature -119.7. NOTES/ISSUES/PROBLEMS From the 9am status meeting: Three supports over the last 24 hours, all routine. One more load segment of OCT2802B was uplinked, so on-board loads are good until 306:16:21. One more segment will complete OCT2802B. Yesterday's load review approved NOV0402A. This is only the second time in history that the load review was approved on the first review! Congratulations to all who made this possible, largely the SAUSAGE tool. Furthermore, it is the FIRST time that the loads were approved on the first review two weeks in a row. There is a problem with the soe file creation when monitor stars are chosen, which required a manual fix. The SAUSAGE problem has been diagnosed, and will be fixed and submitted to the Flight Director's CCB over the next couple of weeks. Star working group will meet at 10am this morning. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- 2540 00 NGC 2264 301:15:02 ACIS-I NONE LOOKS GOOD ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 877-693-7198 PIN 693-7198 or e-mail 6937198@archwireless.net -------------------------------------------------------