To:sot_shift from: Dan Schwartz date: 19 Jun 03, 12:00noon EDT Subject: SOT shift report 2003-06-19 L1428 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Jun_19_2003_L1428.txt. Shift L1428. Start at 170:13:00 GMT = 08:00am 19 Jun EDT End 12:00 noon 19 Jun SOT Lead DAS (Times will be given in GMT on day 170.) PLAN ---- Continue running load JUN1603C. Finish obsid 4398, a 115ks ACIS-S/LETG observation to study absorption features in the neutron star 1E 1207.4-5209. Next Comms: 170:2215 to 2315 171:0430 to 0530 171:0955 to 1155 171:2010 to 2210 172:0200 to 0400 172:0915 to 1115 172:2100 to 2200 173:0545 to 0645 173:1220 to 1420 173:2120 to 2220 Orbital events: 2003:170:08:51:49.536 534 EAPOGEE ORBIT APOGEE 2003:171:16:35:40.389 534 EPERIGEE ORBIT PERIGEE 2003:173:00:19:52.134 535 EAPOGEE ORBIT APOGEE 2003:174:08:03:53.709 535 EPERIGEE ORBIT PERIGEE 2003:175:15:48:13.446 536 EAPOGEE ORBIT APOGEE 2003:176:23:32:52.194 536 EPERIGEE ORBIT PERIGEE 2003:178:07:16:56.162 537 EAPOGEE ORBIT APOGEE 2003:179:15:02:09.967 537 EPERIGEE ORBIT PERIGEE 2003:180:22:45:43.478 538 EAPOGEE ORBIT APOGEE EVENTS ------ Status at AOS, 170:12:22, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 182.491 deg Dec = -52.404 deg ROLL = 257.990 deg Format = 2 OBSID = 4398 1E 1207.4-5209 SIM FA = -467 SIM TSC = 72439 (ACIS-S) DITHER = ENAB HETG = OUT (79.46 deg) LETG = IN ( 4.09 deg) HRC-I HV is ON EPHIN Geom = LARG E150 = 1287.8 E300 = 11.0 E1300 = 0.1 LT 10.0 (RADMON P4GM = 45.9 LT 300. Triggers) P41GM = 0.0 LT 8.47 A-leak = 1.0200 mu-a B-leak = 0.8760 mu-a Gyro 1 Curr 1 139.20 Gyro 1 Curr 2 100.80 Descending through 129562 km. ACIS focal plane temperature -119.7. 14:20 AOS expected. Status is essentially unchanged. Electron EPHIN rates are about 3 times lower, and gyro A1 current down to 134ma. NOTES/ISSUES/PROBLEMS Gyro A1 current has jumped up to ~140ma. From the 9am status meeting: Three 34m supports. Intermittent problems on primary system at DSS-24 led to a swap to backup equipment, but 1st 2.5 hours of data were missed. Data being recovered in the current contact. One SCS loaded, on-board loads good until 174:01:05. June 2303B loads were approved and signed. ACA yellow warnings for primary mirror temperature. Due to increased TEC power for the cooler focal plane. Will review and revise limits. Gyro A1 current has suddenly jumped to ~140ma, and become noisy. There will be a 2pm telecon to the IRU situation, including swap to B side, a report on the B-side calibration, and the derived rate sun mode. ASVT testing of safe mode recovery with the new gyro procedure will take place tomorrow. On-line system 3.9.3 installation is proceeding on schedule or slightly ahead. Today will configure 3rd string so that it will be a backup for ops readiness during the switch. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- No new quick looks, partial data in on 1E 1207.4-5209 ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 877-693-7198 PIN 693-7198 or e-mail 6937198@archwireless.net -------------------------------------------------------