To:sot_shift from: Dan Schwartz date: 23 Feb 05, 12:00noon EST Subject: SOT shift report 2005-02-23 L2043 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/web-cxc/htdocs/acis/SOT_reports/Feb_23_2005_L2043.txt. Shift L2043. Start at 054:13:00 GMT = 08:00am 23 Feb EST End 10:00am 23 Feb SOT Lead DAS (Times will be given in GMT on day 054.) PLAN ---- Continue running load FEB2105B. Do obsid 6229, a piece of the long ACIS-I image of Cyg A to study interaction of the jets with the cluster medium. Then do obsid 5519, an ACIS-S observation of the nearby, radio-bright pulsar B1133+16; obsid 5604, an ACIS-S GTO observation of the gravitationally lensed, high redshift quasar SDSSJ0924+0219. Next Comms: 054:1850 to 1950 055:0300 to 0500 055:1100 to 1200 055:1825 to 1925 056:0300 to 0400 056:1040 to 1240 Orbital events: 2005:055:11:29:25.531 767 EAPOGEE ORBIT APOGEE 2005:056:19:12:43.228 767 EPERIGEE ORBIT PERIGEE 2005:058:02:56:43.488 768 EAPOGEE ORBIT APOGEE 2005:059:10:40:02.246 768 EPERIGEE ORBIT PERIGEE 2005:060:18:23:39.567 769 EAPOGEE ORBIT APOGEE 2005:062:02:07:18.286 769 EPERIGEE ORBIT PERIGEE EVENTS ------ Status at LOS, 054:13:35, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 299.886 deg Dec = 40.727 deg ROLL = 43.488 deg Format = 2 OBSID = 6229 Cygnus A SIM FA = -535 SIM TSC = 96407 (ACIS-I) DITHER = ENAB HETG = OUT (79.09 deg) LETG = OUT (77.59 deg) HRC-I HV is ON EPHIN Geom = LARG E150 = 3.2 E300 = 0.1 E1300 = 0.0 LT 10.0 (RADMON P4GM = 0.0 LT 300. Triggers) P41GM = 0.0 LT 8.47 A-leak = 1.0200 mu-a B-leak = 0.2000 mu-a Ascending through 79437 km. ACIS focal plane temperature -119.7 degC. EPH temp 61.58 degF NOTES/ISSUES/PROBLEMS From the 9am status meeting: Three supports over the past day. No issues. One load segment uplinked, on-board loads good until 057:18:42. FEB2805 products still in work, load review expected tomorrow. MAR0705 work is starting. Good tagup with SOHO engineers yesterday, to discuss common EPHIN and propellant line freezing issues. No experience to directly help with the Chandra concerns, but they have some relevant performance data. UPS system is disconnected Feb 22-24 during 9am-4pm hours to install battery monitoring software, recommended following last summer's UPS problems. ACIS operations/IPI team monthly meeting today, NE-80 6th floor, 4pm. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- 5928 M31* 052:16:38 HRC-I NONE looks okay. there is a streak just to the W of center which looks strange. 6249 B1152+199 053:06:22 ACIS-S NONE Looks okay. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 877-693-7198 PIN 693-7198 or e-mail 6937198@archwireless.net -------------------------------------------------------