To:sot_shift from: Dan Schwartz date: 12 Sep 05, 12:00noon EDT Subject: SOT shift report 2005-09-12 L2244 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/web-cxc/htdocs/acis/SOT_reports/Sep_12_2005_L2244.txt. Shift L2244. Start at 255:13:00 GMT = 08:00am 12 Sep EDT End 10:00am 12 Sep SOT Lead DAS (Times will be given in GMT on day 255.) PLAN ---- We are shut down from an autonomous SCS 107 run at 251:01:57. Next Comms: 255:2115 to 2215 256:0345 to 0445 256:1345 to 1445 256:2245 to 2345 257:0345 to 0445 257:1040 to 1215 257:2035 to 2225 Orbital events: 2005:255:02:48:12.955 842 EPERIGEE ORBIT PERIGEE 2005:256:10:32:12.148 843 EAPOGEE ORBIT APOGEE 2005:257:18:15:16.047 843 EPERIGEE ORBIT PERIGEE 2005:259:02:00:04.378 844 EAPOGEE ORBIT APOGEE 2005:260:09:43:05.542 844 EPERIGEE ORBIT PERIGEE 2005:261:17:28:01.102 845 EAPOGEE ORBIT APOGEE 2005:263:01:11:49.149 845 EPERIGEE ORBIT PERIGEE 2005:264:08:55:58.113 846 EAPOGEE ORBIT APOGEE 2005:265:16:40:20.574 846 EPERIGEE ORBIT PERIGEE EVENTS ------ Status at AOS, 255:11:29, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 8 FIDS = 0 RA = 321.500 deg Dec = -18.502 deg ROLL = 294.297 deg Format = 2 OBSID = 59457 SIM FA = -535 SIM TSC = -99615 (HRC-S) DITHER = ENAB HETG = OUT (79.09 deg) LETG = OUT (77.59 deg) HRC-S HV is ON EPHIN Geom = LARG E150 = 6618.5 E300 = 247.2 E1300 = 9.7 LT 10.0 (RADMON P4GM = 172.8 LT 300. Triggers) P41GM = 0.8 LT 8.47 A-leak = 1.0200 mu-a B-leak = 0.5200 mu-a 13:24 LOS Status is essentially unchanged. Ascending through 83089 km. ACIS focal plane temperature -119.7 degC. EPH temp 74.81 degF NOTES/ISSUES/PROBLEMS From the 9am status meeting: Ten supports over the weekend. Issues with DSS-24 transmitter problems, but no impacts on Chandra operations. A few Transmitter B high power violations occured -- similar to previous occurences and not considered as a concern. Running on DB2 over the weekend, but will fail back to DB1 this morning. Radiation Telecon: A radiation telecon following the status meeting agreed to attempt to restart the observing program by commanding loads at the pass at 256:0345. We will pick up the original SEP1205B schedule with obsid 6220 at 256:08:11, and try to schedule the postponed Crab Nebula obsid 5555 prior to that time. Products due out later today for a late afternoon or early evening load review. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- No observations since day 250. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 877-693-7198 PIN 693-7198 or e-mail 6937198@archwireless.net -------------------------------------------------------