B10 ACIS shift report ...Continuing INT_CAL SAP 61049 from Paul's shift 213:13:21 FP is at -118.7 C Stopped INT_CAL SR2 at 213:14:13 (about 20 min. late due to some commanding confusion at A-->B changeover) started SR3, I-array, graded at ~213:14:15 with OBSID 62739 FP temp = -118.9 C TERRIBLE telemetry from Diego! SR3 may have very spotty data (real-time)... * CHANGE OF PLAN: The Flight Directors want to clear the slate * command and telemetry-wise at B10->A11 shift change in preparation * for IPS4 & so have told us to stop ACIS data taking by ~214:00:30. * So, to preserve the length of the CC3x3 we will have to shorten * INT_CAL SR3 by about 1 hr and end INT_CAL at 213:17:00. Immediately * after that we hope to start the CC3x3. FP temp still -118.9 @ ~120,000 km out Stopped INT_CAL SR3 at 213:17:07 Started CC3x3 SAP61077 SR1 (I-array) at 213:17:35, OBSID=62737, FP=-118.9C Stopped CC3x3 SR1 (I-array) at 213:19:10 FP=-118.7C Started CC3x3 SR2 (S-array) at 213:19:14, OBSID=62736, * ANOTHER CHANGE OF PLAN: Becuase they lost 3 thermistors * on the engines at IPS3, they (the powers-that-be) will use * the other two engines for IPS4. This means they will need * extra time for them to run some patches etc. ie. ACIS is now * told to stop data taking by 213:21:00 Stopped CC3x3 SR2 (S-array) at 213:20:50 FP temp -118.9 C End of ACIS activities for B shift. A-shift replanning: ** EVEN MORE RE-PLANNING!: HRC will give a shot at HV tonight (~2am). ** It takes them 2hrs to come to a decision point. During this ** time we will collect EVENT HISTOGRAM (I?S?) data in FMT 1; If HRC HV ** fails we will revert to INT_CAL in FMT2. Yousaf Bev Royce George Mark