B11 Shift Report (for OBSID's see SOT lead B11 shift report) Picked up the internal calibration run from Paul's shift at ~214:13:00 To test the emergency load shed procedure we used the SCS40 to stop science and power down ACIS - after a "cap" delay. 214:14:05 SCS40 finished execution after ~5 min the FP temperature was -119.5 C ! So the FP heater was controlling at -118.9 earlier! at ~214:14:16 ran SCS70 autonomous power-up -- all well! at ~15:10 started LF functional. Start SOP 61022 at ~15:10 Stop ~16:00 Start SOP 61023 at ~16:25 Stop ~17:17 Start SOP 61019 at ~17:31 Stop ~18:45 Start SOP 61008 at ~18:55 Stop ~21:05 All well as checked by Ed & Bob - ACIS is still wired up ok! 21:25 X-ray flare observed by HRC see: http://solar.sec.noaa.gov/rt_plots/ Next we loaded up the EVHIST patches (~21:10) and executed EVHIST_S array (SOP61012) at ~21:35 FMT2-->FMT1 at 22:45 Chugging along in FMT 1 while HRC is doing it's HV checkouts... 215:00:05 ...last minute update: HRC rates too high powering down HV... we can expect FMT2 soon... Yousaf Butt Ed Boughan Bob Goeke