L-16 Shift Report Aug 7 1999 IPS-5 successful! Chandra is in it's final orbit, finally. Preliminary ranging indicates: Perigee: 9652 km (9676km was the target) Apogee: 139188 km Period: 63h29m20s THE PLAN: Mark suggests running INT_CAL_BKG in two iterations with the following times for SR's: I. 3 hrs, 3 hrs, 3hrs, 3hrs II. 1.5 hrs, 1.5 hrs, 3 hrs, 3 hrs ALSO: IPS deactivation at ~220:08:00 uses slot 191 -- may have to move end of INT_CAL_BKG to 220:07:30 (?) 219:10:13 Got FMT 2 (FP temp = -118.9 C) Started new INT_CAL_BKG procedure (SAP 61082) at 219:10:21 with OBSID=62718 for SR1 (Telemetry v. poor during bias transmission) Stopped SR1 at: 219:13:30 Started SR2 at 219:13:34 with OBSID=62717 FP temp = -118.7 C Stopped SR2 at 219:15:58 a little early due to DSN handovers Started SR3 at 219:16:05 with OBSID=62716 FP = -118.9 C poor commanding and downlink from Diego - surprise! !!!complete LOS ~16:20 to 16:40!!! Stopped SR3 at 219:19:11 Started SR4 at 219:19:15 with OBSID=62715 FP=-118.9 C ============================ Meeting 7th Floor Conference room on Sunday at 9am to discuss scheduling from ACIS door open to SSD open ============================ Yousaf Mike Pat Ellen