Shift report B18 August 9 1999, 1:00am EDT, GMT 221:05:00 ACIS Activities; We opened the door, 'nuff said. Spacecraft perigee passage Day 220 GMT Alt FP Temp 1CR[AB]T 1WR[AB]T 1CB[AB]T 12:50 12,000 -118.7 C -127.9/-127.9 -82.0/-82.0 -62.4/-59.9 14:23 15,500 -112.3 C -113.5/-113.5 -77.1/-77.1 -62.4/-59.9 15:30 27,000 -106.4 C -113.5/-111.1 -77.1/-77.1 -62.4/-59.9 START BAKEOUT PROCEDURE, turn on FP heater at 220:15:47:45, vacuum monitor is at 8.3e-6 Torr 16:09 ????? -59.7 C -103.9/-103.9 -79.6/-79.6 -62.4/-59.9 Turn on DH Bakeout heater, GMT 220:16:12:00 16:12 34,500 16:25 ?????? -38.4 C -96.6/-94.2 -79.6/-79.6 -55.0/-50.0 18:10 52000 +30.2 C -55.0/-55.0 -62.4/-62.4 -17.6/-10.0 18:22 54000 +30.8 C -52.5/-52.5 -59.9/-59.9 -15.1/-7.5 18:33 55000 +30.8 C -52.5/-52.5 -57.4/-57.4 -10.0/-5.0 19:57 60000 +31.3 C -50.0/-50.0 -45.0/-45.0 7.6/15.2 21:05 ????? +31.6 C -50.0/-47.5 -37.6/-37.6 17.8/22.8 Ready for the Door Opening OBSID 62747 1st Heating Cycle Duration max Temp Shaft Rot Close Sw Open Sw 20:50 90 s 56.1 0.0 CLOSED NOPEN ???? 110 s 68.9 11.7 NCLOSED NOPEN 21:50 125 s 79.2 19.5 NCLOSED NOPEN 22:15 140 s 87.0 36.4 NCLOSED NOPEN 22:55 200 s 110.3 71.5 NCLOSED OPEN Yippee !!! The door is open !!!!! The door mechanism worked just fine. The 11.7 degree rotation on the second cycle indicates that stiction in the O-ring was minimal or non-existent. Plan for the rest of the night is to cool the DH and focal plane back to -60 C and -90 C respectively. Staff - Paul Plucinsky, Andrew Northrup, Ed Bougahn, Mark Bautz, Neil Tice, Ellen Sen, Peter Ford, and a bunch of tourists - SOT Lead Bill Podgorski and Mike Juda