Shift report M25 August 15 1999, 10:00pm EDT, GMT 228:02:00 ACIS Activities this Shift: - execute the off-axis effective area observations of G21.5-0.9 from the daily load - execute CAP 279 to repeat the last science run of the above measurements since there was a 4hr deadspot in the schedule before the next daily load kicks in Spacecraft activities: - GMT 228:00:00 NPM Momentun dump FOT Activities: - plan for the generation of the next daily load. Cal and MP must review the order of the measurements. Detailed Notes: OBSID Start Stop 163 11:41 14:53 G21.5-0.9 on S0 164 15:08 17:53 G21.5-0.9 on S1 165 17:58 21:09 G21.5-0.9 on S4 166 21:24 00:09 G21.5-0.9 on S5 1267 00:12 04:30(exp) G21.5-0.9 on S5 [CAP 279] ** the momentum dump could effect pointing stability ** Plan for next shift: GMT 228:04:30 send the stopScience command by hand GMT 228:05:00 next daily load takes over GMT 228:05:41 start OBSID 1055, optical axis determination with PKS0637 GMT 228:06:54 start OBSID 1056, optical axis determination with PKS0637 GMT 228:07:27 shutdown for Belt passage GMT 228:17:00 start OBSID 1057, optical axis determination with PKS0637 Staff: ACIS - Paul Plucinsky, Royce Buehler, Pat Bross, Scott Koch SOT Lead - Bill Podgorski